  • NAO-2007-1076

    Expiration date: 10/30/2014

    September 17, 2014: The City of Norfolk submitted a permit application for improvements to the existing Western Branch Reservoir Dam. The purpose of the project is to provide reliable water supply storage for Norfolk and other communities; prevent a hazard to downstream residents, structures, roadways, or environment from potential failure of a High Hazard dam; comply with the Virginia Department of Conservation and Recreation’s (DCR) dam safety regulations; and comply with the City of Norfolk’s operating permit. Wetland and water impacts for the entire project total 2.629 acres, which include impacts to non-tidal subaqueous land, non-tidal forested wetlands, tidal subaqueous lands, tidal wetlands and intertidal areas. Public comment period ends October 17, 2014.

  • NAO-2008-2566

    Expiration date: 10/6/2014

    The applicant proposes to remove vegetation that exceeds the height tolerances allowed under Navy and FAA regulations from four separate project areas located within the Approach/Departure Clearance Surface and Inner Horizontal Surfaces. This public notice expires Oct. 6, 2014.

  • NAO-2013-0591

    Expiration date: 7/9/2014

    Langley Air Force Base proposes to construct in the same vicinity of an existing fuel pier, a new fuel pier facility that will include about 65,000 cubic yards of dredging, with the dredged material to be transported and discharged at the Norfolk Ocean Disposal Site (NODS).

  • NAO-2001-1717

    Expiration date: 12/5/2013

    The City of Chesapeake Public Works proposes roadway and drainage improvements to Elbow Road between Bethel Baptist Church and the Virginia Beach City Line within the City of Chesapeake. Public comment period ends Dec. 5, 2013

  • NAO-2005-4861

    Expiration date: 12/4/2013

    Lamberts Point proposes to deepen the berth on each side of their Pier N at Lambert Point Docks to -34 ft MLW in Norfolk Virginia. The applicant proposes to dredge 945,000 square feet and remove 104,000 cubic yards of material twice in the next ten years, and is proposing to dredge mechanically and use the Rehandling Basin at Craney Island, or use a hydraulic dredge and direct discharge into Craney Island.