  • NAO-2016-01849 Leesburg Gateway, Town of Leesburg, Virginia

    Expiration date: 5/29/2026

    Leesburg Gateway, LLC requests authorization to impact approximately 1.06 acres of nontidal wetlands, 0.03 acres of open water, and 2,464 linear feet of stream channel associated with the construction of a data center campus, associated infrastructure, and roadway improvements. All work is to occur within the Town of Leesburg, Virginia. The Norfolk District will receive written comments on the proposed work, as outlined above, until May 29, 2026.

  • NAO-2025-2208 (Gibson Creek Mitigation Bank, Halifax County, Virginia)

    Expiration date: 5/25/2026

    The Norfolk District, U.S. Army Corps of Engineers (Corps) received a complete prospectus on January 14, 2026 from Wildlands Holdings XI, proposing the establishment of the Gibson Creek Mitigation Bank to offset non-tidal wetland and stream impacts authorized as part of future federal and state permits.
  • 408-NA0-2026-0025 (City of Norfolk, 200 Block Shoreline Stabilization)

    Expiration date: 5/11/2026

    The City of Norfolk, Virginia, proposes to replace an existing concrete rubble revetment with engineered riprap armor stone and construct a rock apron for scour mitigation along the 200 block of Ocean View Beach between Ocean View Beach Park and Sarah Constant Beach Park. The action being considered as part of this 408 review has the potential to impact the Willoughby Spit and Vicinity Hurricane and Storm Damage Reduction Project. Public comments should be submitted by close of business May 11, 2026.
  • NAO-2024-02657 (City of Virginia Beach The Lakes and Princess Anne Plaza Drainage Improvements project, Virginia Beach, Virginia)

    Expiration date: 5/20/2026

    The applicant requests authorization for the construction of the NLBC and SLBC tide gates, the SLBC weir gates, and the wing wall area proposed along the tide gates and weir gates to protect soils, facilities, and to direct water flow, as well as grading and filling for the construction of the pump station, construction of internal maintenance and access roads, stormwater (SWM) and utilities. The proposed activities will result in permanent impacts to wetlands and waters of the U.S. across NLBC and SLBC including 8,015 square feet (0.18 acre) of palustrine forested (PFO) wetland impacts; 68,112 square feet (1.56 acres) of palustrine open water (POW) impacts; 18,807 square feet (0.43 acre) of tidal non-vegetated wetlands (TNVW) impacts; 16,408 square feet (0.38 acre) of estuarine scrub-shrub (ESS) impacts; 5,211 square feet (0.12 acre) of estuarine emergent (EEM) impacts; and 49,545 square feet (1.14 acres) to estuarine open water (EOW) impacts. Additionally, the project will include the dredging of London Bridge Creek and the eastern drainage channel at NLBC as well as dredging of The Lakes Channel and Green Run Canal at SLBC, resulting in permanent, unavoidable impacts to 38,099 square feet (0.87 acre) of open water (EOW). The construction of and activities related to the construction of the NLBC and SLBC tide gates and weir gates as well as the proposed dredging activities will also result in the permanent conversion of wetlands into other habitat types. Cumulatively, there is proposed permanent conversion of 3,260 square feet (0.07 acre) of PFO wetland to PEM, PUB, and Estuarine Unconsolidated Bottom (EUS); 13,337 square feet (0.31 ac) of TNVW to EUS and EOW; 6,344 square feet (0.15 ac) of ESS to EUS and EOW; 4,617 square feet (0.11 ac) of EEM to PUB, EUS, and EOW. The project will also include the construction access to the retaining wall and associated grading and installation of a temporary trestle at NLBC, resulting in temporary impacts to 968 square feet (0.02 acre) of PFO, 5,355 square feet (0.12 acre) of TNVW, 2,119 square feet (0.05 acre) of ESS, 1,478 square feet (0.03 acre) EEM, and 2,398 square feet (0.06 acre) EOW. All temporary impacts will be returned to preconstruction contours and seeded/planted with appropriate wetland vegetation as applicable. The proposed project’s purpose is to address flooding in The Lakes and Princess Anne Plaza neighborhoods, which have experienced repeated flooding from both major and minor storm events due to low-lying topography, outdated stormwater infrastructure, tidal influence, and limited runoff storage. In order to maximize flood mitigation in these neighborhoods, one tide gate would not be sufficient as London Bridge Creek receives hydrologic input from both the Lynnhaven River to the north and West Neck Creek/ Canal 2 from the south depending upon tides and wind events. The tide gates at both sites (NLBC and SLBC) work together to form an integrated system to manage stormwater and protect neighborhoods from both tidal and rainfall-induced flooding, regardless of whether the tidal flooding comes from the south or north. The tide gates will remain open to allow the passage of water through the system and the forebay gates will be closed other than for routine maintenance.

  • 408-NAO-2026-0028 (700 Rosemont Ave New Mooring Dolphin)

    Expiration date: 4/30/2026

    Interested parties are hereby notified that a request for permission to alter a U.S. Army Corps of Engineers (USACE) federal project pursuant to Section 14 of the Rivers and Harbors Act of 1899, 33 U.S.C. 408 (Section 408) has been received and is under evaluation by the Norfolk District. This Section 408 request was submitted by Rosemont Property LLC to install a single 19-pile mooring dolphin along the existing bulkhead to support mooring operations along the Southern Branch of the Elizabeth River at 700 Rosemont Avenue, Chesapeake, VA. This project may alter the Norfolk Harbor and Channels Federal Navigation Project – Southern Branch of the Elizabeth River (NHC-SBER). Comments should be received by the close of business on April 30, 2026.