Results:
Archive: 2013
Clear
  • NAO-2001-1717

    Expiration date: 12/5/2013

    The City of Chesapeake Public Works proposes roadway and drainage improvements to Elbow Road between Bethel Baptist Church and the Virginia Beach City Line within the City of Chesapeake. Public comment period ends Dec. 5, 2013

  • NAO-2005-4861

    Expiration date: 12/4/2013

    Lamberts Point proposes to deepen the berth on each side of their Pier N at Lambert Point Docks to -34 ft MLW in Norfolk Virginia. The applicant proposes to dredge 945,000 square feet and remove 104,000 cubic yards of material twice in the next ten years, and is proposing to dredge mechanically and use the Rehandling Basin at Craney Island, or use a hydraulic dredge and direct discharge into Craney Island.

  • NAO-2013-1722

    Expiration date: 12/4/2013

    The applicants are proposing to hydraulically dredge approximately 8,860 square feet (458 cubic yards) of subaqueous bottom to a maximum depth of -3.0 feet mean low water (MLW) in order to re-establish navigational access. The project is located in waters near the intersection of Dare Road and Old House Point Circle on the Poquoson River in Yorktown, Virginia.

  • NAO-08-3101

    Expiration date: 10/24/2013

    The CenterPoint Properties has requested to modify the existing permit for the construction of an intermodal center in Suffolk, Virginia. The applicant requests a permit modification to include the construction of an industrial access roadway connector (the Kenyon Road Connecter) between Kenyon Road and US Route 58 (Holland Road) in order to reduce commercial truck traffic on Kenyon Road within the vicinity of residential homes and education facilities. The proposed modification will result in a net increase of 0.45 acres of permanent impacts to nontidal wetlands and 0.30 acres of temporary impacts to nontidal impacts, resulting in a total of 7.66 acres of permanent wetland impacts associated with the project.

  • NAO-2006-2364

    Expiration date: 10/22/2013

    The bank sponsor, Gum Brothers LLC, proposes to establish a compensatory mitigation banking agreement ("Limestone Mitigation Bank") in Leesburg, Va., to provide mitigation for impacts to streams within the specified service area. Public comment period ends Oct. 22, 2013.