Public Notice Distribution List

To be added to the Regulatory Branch Public Notice email distribution list, please send an email to Rod Desk at CENAO-.REG_ROD@usace.army.mil 

Results:
Tag: Norfolk District
Clear
  • NAO-2014-1711

    Expiration date: 11/1/2015

    Lane/Corman Joint Venture is proposing the Berkmar Drive Extension between Hilton Heights Road (Route 1438) and Towncenter Drive (Route 1719) for approximately 2.46 miles and running parallel to and west of Seminole Trail (Route 29 Business). The proposed activities will include increased capacity and mobility, improve safety and improve operational deficiencies along the US Route 29 corridor. Comment period ends Nov. 1, 2015.

  • NAO-2014-0896

    Expiration date: 10/28/2015

    The city of Norfolk has proposed the mechanical dredging of approximately 55 acres of Mason Creek, from existing depths of 2.3 feet to dredge cut elevations of -4.5 feet to -3.5 feet. Approximately 165,000 cubic yards of dredged material will be removed, loaded onto trucks at two upland transfer sites, and then trucked to an approved upland disposal facility. The primary purpose of the project is to improve water quality. Comment period ends Oct. 28, 2015.

  • NAO-2015-1371 Colonna's Shipyard

    Expiration date: 10/26/2015

    Colonna’s Shipyard is proposing to construct a drydock and supporting structures at their property along Spotico Creek, a tributary to the Eastern Branch of the Elizabeth River in Norfolk, Virginia.

  • NAO-2015-00980 Extension for Fauquier County Sports Complex

    Expiration date: 10/3/2015

    The district commander has granted a 15-day comment period extension for the public notice NAO-2015-00980. Requests or comments must be received by Oct. 3, 2015.

  • NAO-2006-05982 Princess Anne Road widening

    Expiration date: 10/15/2015

    The City of Virginia Beach proposes the widening of a segment of Princess Anne Road (Phase VII) from General Booth Boulevard to Sandbridge Road/Upton Drive from a 2-lane road to a 4-lane road with median and shared multi-use paths on both sides of the road. The roadway improvements will extend further east along Sandbridge Road for approximately 0.5 miles where the road widening will merge into the existing 2-lane road. Public comment period ends Oct. 15, 2015.