NAO-2013-02299

Published April 3, 2014
Expiration date: 5/3/2014

NAO-2013-02299

The district commander has received a joint application for federal and state permits as described below:

APPLICANT

Savage Neck VA, LLC and Kimberly Jarvis

95, Route 17

Paramus, N.J. 07852

WATERWAY AND LOCATION OF THE PROPOSED WORK:  The project is located in Chesapeake Bay at 2465, 2507 and Lot 66-A-6C, Savage Neck, Cape Charles, Northampton County, Va.

PROPOSED WORK AND PURPOSE:  The applicant proposes to construct five, 33-foot wide by 180-foot long offshore breakwaters with associated beach nourishment.  The breakwaters will be situated an average of 180 feet and a maximum of 203 feet channelward of mean high water.  Nourishment will cover 152,477 square feet of intertidal waters with the grain sized to be compatible for Northeastern beach tiger beetle habitat.  The project footprint will exceed one acre, but will reduce erosion over three adjacent properties. Breakwaters have been designed to the minimum size necessary to retain the correct angle of repose for the breakwater walls.  Access will be limited to one point.

In addition to the required Department of the Army permit, the applicant must obtain a Virginia Water Protection Permit/401 certification from the Virginia Department of Environmental Quality assuring that applicable laws and regulations pertaining to water quality are not violated and a permit from the Northampton County Wetlands Board.  Project drawings are attached.

AUTHORITY:  Permits are required pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403), Sections 401 and 404 of the Clean Water Act (Public Law 95-217) and Title 62.1 of the Code of Virginia.

FEDERAL EVALUATION OF APPLICATION:  The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest.  The decision will reflect the national concern for both protection and utilization of important resources.  The benefits which reasonably may be expected from the proposal must be balanced against its reasonably foreseeable detriments.  All of the proposal's relevant factors will be considered, including conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, flood plain values, land use classification, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.  The Environmental Protection Agency's "Guidelines for Specification of Disposal Sites for Dredged or Fill Material" will also be applied (Section 404(b)(1) of the Clean Water Act).

The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the direct, indirect, and cumulative impacts of this proposed activity.  Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal.  To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above.  Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act.  Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.  Anyone may request a public hearing to consider this permit application by writing to the District Commander within 30 days of the date of this notice, stating specific reasons for holding the public hearing.  The District Commander will then decide if a hearing should be held.

Preliminary review indicates that:  (l) no environmental impact statement will be required; (2) there may be an affect to listed species under the Endangered Species Act of 1973 and the Official Species List and Species Conclusion Table is attached for review and comment by Fish and Wildlife Service; (3) impacts to Atlantic Sturgeon (Acipenser oxyrinchus oxyrinchus) habitat will be minimized by the location and time of year of construction, and (3) no known properties eligible for inclusion or included in the National Register of Historic Places are in or near the permit area, or would likely be affected by the proposal.  Additional information might change any of these findings.

For compliance with the Coastal Zone Management Act of 1972, as amended for projects located in Tidewater, the applicant must certify that federally licensed or permitted activities affecting Virginia's coastal uses or resources will be conducted in a manner consistent with the Virginia Coastal Zone Management Program (VCP) and obtain concurrence from the Department of Environmental Quality (DEQ), Office of Environmental Impact Review (OEIR).  We have not received a certification from the applicant prior to publication of this public notice.  It is the applicant’s responsibility to submit a consistency certification to the Office of Environmental Impact Review for concurrence or objection and proof of concurrence must be submitted to the Corps prior to final permit issuance. A template federal consistency certification can be found here: http://www.deq.state.va.us/Programs/EnvironmentalImpactReview/FederalConsistencyReviews.aspx#cert.  For more information or to obtain a list of the enforceable policies of the VCP, contact the Department of Environmental Quality, Office of Environmental Impact Review at (804) 698-4330 or e-mail: ellie.irons@deq.virginia.gov or john.fisher@deq.virginia.gov.

The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996 (Public Law 104-267), requires all Federal agencies to consult with the National Marine Fisheries Service on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat (EFH).   Chesapeake Bay contains Essential Fish Habitat (EFH) for the eggs, larvae,  juvenile, and adult life stages of 15 species including red hake (Urophycis chuss), windowpane flounder (Scopthalmus aquosus), Atlantic sea herring (Clupea harengus), bluefish (Pomatomus saltatrix), Atlantic butterfish (Peprilus triacanthus), summer flounder (Paralicthys dentatus), scup (Stenotomus chrysops), black sea bass (Centropristus striata), king mackerel (Scomberomorus cavalla), Spanish mackerel (Scomberomorus maculatus), cobia (Rachycentron canadum), red drum (Sciaenops ocellatus), dusky shark (Charcharinus obscurus), sandbar shark (Charcharinus plumbeus), sand tiger shark (Odontaspis taurus).  The habitat which this project would affect consists of shallow water and intertidal nonvegetated wetlands.  The proposed project is described in Proposed Work and Purpose, above. The project will fill portions of the intertail and shallow water habitat, but will reduce/prevent further erosion of the bank and resulting sedimentation of the habitat.  Our assessment of the project leads us to a preliminary determination that it will not have a substantial adverse effect on EFH and therefore expanded EFH consultation is not required.  Our rationale for this preliminary determination is based on the absence of vegetated wetlands, submerged aquatic vegetation, and anadromous fish spawning habitat.  Based on comments from the National Marine Fisheries Service in response to this public notice, further EFH consultation may be necessary.

COMMENT PERIOD:  Comments on this project should be made in writing, addressed to the Norfolk District, Corps of Engineers (ATTN:  CENAO-WR-R), 803 Front Street, Norfolk, Virginia  23510-1096, and should be received by the close of business on May 3, 2014.

PRIVACY & CONFIDENTIALITY:  Comments and information, including the identity of the submitter, submitted in response to this Public Notice may be disclosed, reproduced, and distributed at the discretion of the U.S. Army Corps of Engineers.  Information that is submitted in connection with this Public Notice cannot be maintained as confidential by the U.S. Army Corps of Engineers. Submissions should not include any information that the submitter seeks to preserve as confidential.

If you have any questions about this project or the permit process, contact Robert Cole at Robert.h.cole@usace.army.mil.

FOR THE DISTRICT COMMANDER:

Peter R. Kube

Chief, Eastern Virginia Regulatory Section