Public Notice Distribution List

To be added to the Regulatory Branch Public Notice email distribution list, please send an email to Rod Desk at CENAO-.REG_ROD@usace.army.mil 

Results:
Tag: Section 408
Clear
  • 408-NA0-2022-0021; Behrman, Broad Bay in Virginia Beach

    Expiration date: 4/26/2022

    The public comment period is open until April 26, 2022, for a Joint Permit Application from from Brady Behrman to remove the existing pier, lift, and boat house, and construct approximately 73 linear feet of riprap, a 7'x54' groin, 72 linear feet of timber bulkhead, and a 280 linear foot private open pile pier with a L-head, boat lift, open sided roof, (3) PWC lifts, and (5) mooring piles along Broad Bay at 1644 Cutty Shark Road, Virginia Beach, VA.
  • 408-NA0-2022-0027 (Cripple Creek transfer station)

    Expiration date: 4/19/2022

    With a comment period closing April 19, the Norfolk District recieved a joint permit application from the city of Virginia Beach for construction of the Cripple Creek Dredged Material Transfer Station along the Lynnhaven River's eastern branch adjacent to 2540 Virginia Beach Blvd.
  • 408-NA0-2022-0033; Preservation Virginia, Jamestown Island Protection Project

    Expiration date: 4/18/2022

    The public comment period is open for a Joint Permit Application from Preservation Virginia for the addition of 1,716 linear feet of riprap revetment along the lower portion of an existing concrete revetment at Jamestown Island, situated along the James River in James City County.
  • Ocean View Dune Restoration – City of Norfolk, VA

    Expiration date: 2/24/2022

    Sea Mist LLC proposes to restore the historic coastal primary sand dune landward of +5 ft NAVD88 via sand replenishment and plantings, and establish the development limits on West Ocean View Ave. in Willoughby Beach on Lots 1, 1A,2, 18A, 19, 20 of Block 24 and a portion of 11th View Street.
  • Section 408 Review of Sand Maintenance Activities, Sandbridge Beach, Virginia Beach, Virginia

    Expiration date: 7/9/2021

    The considered actions may impact the Sandbridge Beach Erosion Control and Hurricane Protection Project and include removing excess sand that has migrated onto private property for relocation onto Sandbridge Beach.