February 06, 2025
CENAO-WRR
NAO-2021-01677
FEDERAL PUBLIC NOTICE
The District Commander has received a joint permit application for Federal and State permits as described below:
APPLICANT
W F Magann Corporation
3220 Mariner Avenue
Portsmouth, VA 23703
PROJECT LOCATION: W F Magann Corporation, 3106 West Norfolk Road, Portsmouth, Virginia 23703
PROJECT SIZE: 4.8 ACRES
NEAREST WATERWAY: Elizabeth River
LATITUDE AND LONGITUDE: 36.859965, -76.342996
PROJECT DESCRIPTION AND PURPOSE:
W F Magann Corporation is proposing to perform new and future maintenance dredging by mechanical methods for the extended waterfront development at the W F Magann East Yard on the Western Branch of the Elizabeth River in Portsmouth, Virginia.
This project includes the following activities: (1) the new work dredging by mechanical methods of the 209,250 square foot (sf) W F Magann East Yard (site) to a maximum depth of -17 feet MLLW (2) the future maintenance dredging by mechanical methods of the 209,250 sf site to a maximum depth of -17 feet MLLW (3) the initial removal of approximately 59,250 cubic yards, and the subsequent removal of approximately 20,000 cubic yards per maintenance cycle (4) the disposal of the dredged material via scows to Craney Island Dredged Material Management Area, Shirley Plantation, and/or an approved upland facility.
AVOIDANCE AND MINIMIZATION:
The proposed dredging footprint has been designed to limit the impacts to the maximum extent practicable.
COMPENSATORY MITIGATION:
Compensatory mitigation is required for the 4,830 sf of non-vegetated wetland impacts, and the 65,485 sf of shallow water habitat impacts.
In addition, the applicant must obtain an Individual Section 401 Water Quality Certification or waiver from the Virginia Department of Environmental Quality (DEQ) assuring that applicable laws and regulations pertaining to water quality are not violated.
A copy of the joint permit application can be found on the Virginia Marine Resources Commission’s website (hyperlink).
AUTHORITY:
(X) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403).
( ) Sections 401 and 404 of the Clean Water Act (Public Law 95-217) and Title 62.1 of the Code of Virginia.
( ) Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972 (33 U.S.C. 1413).
(X) Section 14 of the Rivers and Harbors Act of 1899 (33 U.S.C. 408 (Section 408)).
FEDERAL EVALUATION OF APPLICATION:
The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. The decision will reflect the national concern for both protection and utilization of important resources. The benefits which reasonably may be expected from the proposal must be balanced against its reasonably foreseeable detriments. All of the proposal's relevant factors will be considered, including conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, flood plain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people. The Environmental Protection Agency's "Guidelines for Specification of Disposal Sites for Dredged or Fill Material" will also be applied (Section 404(b)(1) of the Clean Water Act).
The Corps of Engineers is soliciting comments from the public, federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the direct, indirect, and cumulative impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on communities with Environmental Justice concerns, endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement (EIS) pursuant to the National Environmental Policy Act. Preliminary review of the application indicates that no EIS will be required.
Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Anyone may request a public hearing to consider this permit application by writing to the District Commander within 30 days of the date of this notice, stating specific reasons for holding the public hearing. The District Commander will then decide if a hearing should be held.
ENDANGERED SPECIES:
After conducting the Norfolk District Endangered Species Act (ESA) Project Review Process, the Corps has made the preliminary determination that:
There may be an effect to listed/proposed/candidate species and/or designated/proposed critical habitat under the ESA of 1973. The U.S. Fish and Wildlife Service (FWS) Information and Planning and Consultation (IPaC) Official Species List and Species Conclusion Table are attached for review and comment by the FWS and the National Marine Fisheries Service (NMFS).
Additional information might change any of these findings.
HISTORIC AND CULTURAL RESOURCES
No known Historic Resources eligible for inclusion or included in the National Register of Historic Places (NRHP) are in or near the Corps permit area or would likely be affected by the proposal.
Additional information may change any of these findings.
ESSENTIAL FISH HABITAT:
The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996 (Public Law 104-267), requires all Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat (EFH).
The Western Branch of the Elizabeth River contains Essential Fish Habitat (EFH) for the egg, larval, juvenile, and adult life stages of 9 species including red hake (Urophycis chuss), windowpane flounder (Scopthalmus aquosus), Atlantic herring (Clupea harengus), bluefish (Pomatomus saltatrix), Atlantic butterfish (Peprilus triacanthus), summer flounder (Paralicthys dentatus), black sea bass (Centropristus striata), sandbar shark (Charcharinus plumbeus), and clearnose skate. The habitat which this project would affect consists of shallow water areas and non-vegetated wetlands (compensatory mitigation is being required for both). The proposed project is described in Proposed Work and Purpose, above. Our assessment of the project leads us to a preliminary determination that it will not have a substantial adverse effect on EFH, and therefore expanded EFH consultation is not required. Our rationale for this preliminary determination is based on the expected minimal nature of the direct impacts, minimal and temporary increases in turbidity, and the absence of submerged aquatic vegetation, anadromous fish spawning habitat in the project area, and the existing poor water quality and unsuitable substrate. Based on comments from the NMFS in response to this public notice, further EFH consultation may be necessary.
VIRGINIA’S COASTAL ZONE MANAGEMENT PROGRAM:
For compliance with the Coastal Zone Management Act of 1972, as amended for projects located in Virginia’s Coastal Zone, the applicant must certify that federally licensed or permitted activities affecting Virginia's coastal uses or resources will be conducted in a manner consistent with the Virginia’s Coastal Zone Management Program (Virginia CZM Program), and obtain concurrence from the Department of Environmental Quality (DEQ), Office of Environmental Impact Review (OEIR). It is the applicant’s responsibility to submit a consistency certification to the OEIR for concurrence or objection, and proof of concurrence must be submitted to the Corps prior to final permit issuance. A template federal consistency certification can be found in the Federal Consistency Manual here: https://www.deq.virginia.gov/our-programs/environmental-impact-review/federal-consistency.
For more information or to obtain a list of the enforceable policies of the Virginia CZM Program, contact the DEQ-OEIR at (804) 659-1915 or e-mail: bettina.rayfield@deq.virginia.gov.
The applicant has not submitted concurrence.
SECTION 408:
The Norfolk District Operations Branch has determined that the proposed activity may require permission to alter a U.S. Army Corps of Engineers (USACE) project pursuant to Section 14 of the Rivers and Harbors Act of 1899 (33 U.S.C. 408) [Section 408]. Interested parties are hereby notified this request for permission to alter the Western Branch of the Elizabeth River portion of the Norfolk Harbor and Channels Federal Navigation Project has been received and will be evaluated by the Norfolk District Section 408 Coordinator. Written comments, including any objections to the proposed alteration, stating reasons therefor, are being solicited from anyone having an interest in the requested alteration. Section 408 authorizes the Secretary of the Army to grant permission for the alteration or occupation or use of a USACE project if the Secretary determines that the activity will not be injurious to the public interest and will not impair the usefulness of the project. Comments specific this Section 408 review should be submitted directly to the Section 408 Coordinator, Katy Damico, at nao.section408@usace.army.mil and copied to the Regulatory contact noted in the Comment Period section below.
VIRGINIA’S SECTION 401 WATER QUALITY CERTIFICATION PROGRAM:
The Clean Water Act (CWA) Section 401 Certification Rule (Certification Rule, 40 CFR 121), effective September 11, 2020, requires certification, or waiver, for any license or permit that authorizes an activity that may result in a discharge. The scope of a CWA Section 401 certification is limited to ensuring that a discharge from a Federally licensed or permitted activity will comply with water quality requirements. To comply with the Virginia Section 401 Water Quality Certification Program and the Certification Rule, the applicant is responsible for adhering to the procedures outlined in the Certification Rule when requesting certification from the certifying authority, the Virginia Department of Environmental Quality. In accordance with Certification Rule part 121.12, the Corps will notify the U.S. Environmental Protection Agency Administrator when it has received a Department of the Army (DA) permit application and the related certification. The Administrator is responsible for determining whether the discharge may affect water quality in a neighboring jurisdiction. The DA permit may not be issued pending the conclusion of the Administrator’s determination of effects on neighboring jurisdictions.
COMMENT PERIOD:
Comments on this project should be in writing and can be sent to https://rrs.usace.army.mil/rrs/public-notices. or by regular mail, addressed to the Norfolk District, Corps of Engineers (ATTN: CENAO-WRR), 803 Front Street, Norfolk, VA 23510-1011, and should be received by the close of business on March 7, 2025.
PRIVACY AND CONFIDENTIALITY:
Comments and information, including the identity of the submitter, submitted in response to this Public Notice may be disclosed, reproduced, and distributed at the discretion of the U.S. Army Corps of Engineers. Information that is submitted in connection with this Public Notice cannot be maintained as confidential by the U.S. Army Corps of Engineers. Submissions should not include any information that the submitter seeks to preserve as confidential.
If you have any questions about this project or the permit process, contact
MS. Autumn Crawford, at autumn.m.crawford@usace.army.mil, or 757-289-1426.