Public Notice Distribution List

To be added to the Regulatory Branch Public Notice email distribution list, please send an email to Rod Desk at CENAO-.REG_ROD@usace.army.mil 

  • NAO-2011-00900

    Expiration date: 1/11/2013

    Clintwood Elkhorn Mining Company proposes to conduct bituminous coal extraction on a proposed surface mine of approximately 260 acres in Buchanan County, Va. The applicant proposes to fill and excavate waters of the U. S. during mining and excess material disposal for the purpose of recovering approximately 2.2 million tons of coal. Public comment period ends Jan. 11, 2013.

  • NAO-2010-0423/2012-1671

    Expiration date: 1/10/2013

    Danville Public Works proposes to construct Phase I of an industrial park to be known as the “Berry Hill Mega Park” in Pittsylvania County, Va. The applicant proposes to compensate for permanent stream channel impacts with permittee responsible compensation. Public comment period ends Jan. 10, 2013.

  • NAO-121207-Millennium

    Expiration date: 1/21/2013

    An Environmental Assessment (EA) has been prepared to assess the potential impacts of the expansion of Arlington National Cemetery (ANC), known as the Millennium Project. The Millennium Site will be developed to increase burial space at ANC. Building and site element construction shall be suitable for the environment and complementary to the architectural theme and historical considerations of ANC.

  • NAO-2007-4126 (VMRC 12-1725)

    Expiration date: 1/7/2013

    The Isle of Wight County proposes roadway improvements to Benn’s Church Boulevard (State Route 10/32) and Brewer’s Neck Boulevard (US Route 258) and the construction an extension of Brewer’s Neck Boulevard in Isle of Wight County, Va. Public comment period ends Jan. 7, 2013.

  • NAO-00-2203

    Expiration date: 12/18/2012

    Plains Marketing, L.P., proposes to convert an existing idled petroleum refinery into a crude oil transportation terminal in Yorktown, Va. Impacts to low-vlaue wetlands are expected and will be off-set by the purchase of wetland credits from a mitigation bank. Public comment period ends Dec. 18, 2012.