Results:
Tag: Environmental Assessment
Clear
  • Environmental Assessment: Gathright Dam Low Flow Augmentation Project

    Expiration date: 1/21/2013

    This Environmental Assessment was prepared to assess the potential impacts of the Gathright Dam Low Flow Augmentation Project on the Jackson River, Lake Moomaw and surrounding area near Covington, Va. The goal of this project is to improve aquatic habitat quality in the Jackson River, downstream of the Gathright Dam. The result of this project, when implemented, would be a revision of the Water Control Plan for the Gathright Dam and Lake Moomaw Project.

  • NAO-121207-Millennium

    Expiration date: 1/21/2013

    An Environmental Assessment (EA) has been prepared to assess the potential impacts of the expansion of Arlington National Cemetery (ANC), known as the Millennium Project. The Millennium Site will be developed to increase burial space at ANC. Building and site element construction shall be suitable for the environment and complementary to the architectural theme and historical considerations of ANC.

  • EA for Millennium Area Headstone Removal Project

    Expiration date: 12/7/2012

    This Environmental Assessment was prepared to assess the potential impacts of the Millennium Area Headstone Removal Project on property administered by Arlington National Military Cemeteries and National Park Service property at Arlington County, Va. The purpose of the project is to remove all headstones being currently used as stream stabilization within ANC and NPS-administered property, while providing stabilization measures adequate to ensure that the system is not degraded. This project would remove the headstones and dispose of them properly. Public comment period ends Nov. 2, 2012.