25 October 2022
CENAO-WRR
NAO-2014-00474 / VMRC# 22-V1758
FEDERAL PUBLIC NOTICE
The District Commander has received a joint permit application for Federal and State permits as described below:
APPLICANT
Microsoft Corporation
c/o Ms. Laura Pollitt
1 Microsoft Way
Redmond, WA 98052
PROJECT LOCATION: The project is located at the Lakeside Commerce Park, at Commerce Drive in Clarksville, Virginia.
PROJECT SIZE: The proposed project is located on a 259.1 acre parcel currently under silvicultural use.
NEAREST WATERWAY: Panhandle Creek
LATITUDE AND LONGITUDE: 36.631443 / -78.516707
PROJECT DESCRIPTION AND PURPOSE: Microsoft proposes to construct a new data center facility to house servers used in cloud-based computing. This facility will be constructed as an addition to Microsoft’s established southern Virginia Regional Network Group, which has outgrown current capacity faster than anticipated. The campus will result in the permanent loss of 7.87 acres of palustrine forested (PFO) wetlands, 0.11 acres of palustrine emergent (PEM) wetlands, 0.02 acres of palustrine scrub-shrub (PSS) wetlands, 1,637linear feet of intermittent (R4) stream channel, and 66 linear feet of ephemeral (R6) stream channel. Additionally, 1.64 acres of PFO wetlands are proposed to be permanently converted to PEM wetlands, and 0.24 acres of PEM wetlands are proposed to be temporarily impacted for the installation and maintenance of overhead power lines.
AVOIDANCE AND MINIMIZATION: the applicant has designed their campus layout to minimize impacts to wetlands and waters while still achieving their project purpose and plans to offset their unavoidable impacts with compensatory mitigation.
COMPENSATORY MITIGATION: Compensatory mitigation for unavoidable impacts will be achieved through the purchase of off-site mitigation credits from a Wetland and Stream Mitigation Bank. The total compensation requirement for permanent wetland impacts is 17.52 credits, based on standard mitigation ratios. Additionally, the total compensation requirement for permanent stream impacts is 1,837 credits, based on the Unified Stream Methodology.
In addition, the applicant must obtain an Individual Section 401 Water Quality Certification or waiver from the Virginia Department of Environmental Quality (DEQ) assuring that applicable laws and regulations pertaining to water quality are not violated.
A copy of the joint permit application can be found on the Virginia Marine Resources Commission’s website HERE
AUTHORITY:
( ) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403).
(X) Sections 401 and 404 of the Clean Water Act (Public Law 95-217) and Title 62.1 of the Code of Virginia.
( ) Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972 (33 U.S.C. 1413).
FEDERAL EVALUATION OF APPLICATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. The decision will reflect the national concern for both protection and utilization of important resources. The benefits which reasonably may be expected from the proposal must be balanced against its reasonably foreseeable detriments. All of the proposal's relevant factors will be considered, including conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, flood plain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people. The Environmental Protection Agency's "Guidelines for Specification of Disposal Sites for Dredged or Fill Material" will also be applied (Section 404(b)(1) of the Clean Water Act).
The Corps of Engineers is soliciting comments from the public, federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the direct, indirect, and cumulative impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement (EIS) pursuant to the National Environmental Policy Act. Preliminary review of the application indicates that no EIS will be required.
Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Anyone may request a public hearing to consider this permit application by writing to the District Commander within 30 days of the date of this notice, stating specific reasons for holding the public hearing. The District Commander will then decide if a hearing should be held.
ENDANGERED SPECIES: After conducting the Norfolk District Endangered Species Act (ESA) Project Review Process, the Corps has made the preliminary determination that:
The Northern long-eared bat may be affected, but the FWS Information and Planning and Consultation (IPaC) 4(d) determination key was completed and no further coordination with the FWS is required.
Additional information might change any of these findings.
HISTORIC AND CULTURAL RESOURCES:
Historic Resources eligible for inclusion or included in the NRHP are in or near the Corps permit area or would likely be affected by the proposal.
Additional information may change any of these findings.
ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996 (Public Law 104-267), requires all Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat (EFH).
There is no EFH in the Corps area of responsibility.
VIRGINIA’S COASTAL ZONE MANAGEMENT PROGRAM: For compliance with the Coastal Zone Management Act of 1972, as amended for projects located in Virginia’s Coastal Zone, the applicant must certify that federally licensed or permitted activities affecting Virginia's coastal uses or resources will be conducted in a manner consistent with the Virginia’s Coastal Zone Management Program (Virginia CZM Program), and obtain concurrence from the Department of Environmental Quality (DEQ), Office of Environmental Impact Review (OEIR). It is the applicant’s responsibility to submit a consistency certification to the OEIR for concurrence or objection, and proof of concurrence must be submitted to the Corps prior to final permit issuance. A template federal consistency certification can be found in the Federal Consistency Manual here: https://www.deq.virginia.gov/permits-regulations/environmental-impact-review/federal-consistency . For more information or to obtain a list of the enforceable policies of the Virginia CZM Program, contact the DEQ-OEIR at (804) 659-1915 or e-mail: bettina.rayfield@deq.virginia.gov.
No concurrence is required because the project is not located within Virginia’s Coastal Zone.
VIRGINIA’S SECTION 401 WATER QUALITY CERTIFICATION PROGRAM: The Clean Water Act (CWA) Section 401 Certification Rule (Certification Rule, 40 CFR 121), effective September 11, 2020, requires certification, or waiver, for any license or permit that authorizes an activity that may result in a discharge. The scope of a CWA Section 401 certification is limited to ensuring that a discharge from a Federally licensed or permitted activity will comply with water quality requirements. To comply with the Virginia Section 401 Water Quality Certification Program and the Certification Rule, the applicant is responsible for adhering to the procedures outlined in the Certification Rule when requesting certification from the certifying authority, the Virginia Department of Environmental Quality. In accordance with Certification Rule part 121.12, the Corps will notify the U.S. Environmental Protection Agency Administrator when it has received a Department of the Army (DA) permit application and the related certification. The Administrator is responsible for determining whether the discharge may affect water quality in a neighboring jurisdiction. The DA permit may not be issued pending the conclusion of the Administrator’s determination of effects on neighboring jurisdictions.
COMMENT PERIOD: Comments on this project should be in writing and can be sent by either email to matt.m.wicks@usace.army.mil, or by regular mail, addressed to the Norfolk District, Corps of Engineers (ATTN: Matthew Wicks CENAO-WRR), 803 Front Street, Norfolk, VA 23510-1011, and should be received by the close of business on 24 November 2022.
PRIVACY AND CONFIDENTIALITY: Comments and information, including the identity of the submitter, submitted in response to this Public Notice may be disclosed, reproduced, and distributed at the discretion of the U.S. Army Corps of Engineers. Information that is submitted in connection with this Public Notice cannot be maintained as confidential by the U.S. Army Corps of Engineers. Submissions should not include any information that the submitter seeks to preserve as confidential.
If you have any questions about this project or the permit process, contact Mr. Matthew Wicks either by email at matt.m.wicks@usace.army.mil or by telephone at (757) 201-7540.