Public Notice Distribution List

To be added to the Regulatory Branch Public Notice email distribution list, please send an email to Rod Desk at CENAO-.REG_ROD@usace.army.mil 

Results:
Tag: va
Clear
  • 408-NAO-2025-0035 (Colonna Shipyard Facility Maintenance Dredging Project)

    Expiration date: 5/13/2026

    Interested parties are hereby notified that a request for permission to alter a U.S. Army Corps of Engineers (USACE) federal project pursuant to Section 14 of the Rivers and Harbors Act of 1899, 33 U.S.C. 408 (Section 408) has been received and is under evaluation by the Norfolk District. This Section 408 request was submitted by Colonna Shipyard, c/o Mr. Mark Essert, Executive Director of Operations, for the combination of all of the existing and previously permitted dredging projects at Colonna Shipyard in Norfolk, VA into a single full yard maintenance dredging permit. This request/permit will include the Drydock #3 dredging, the Travel Lift dredging (West Yard), the Drydock #2 Relocation, Pescara Creek and the Main Yard (Drydock #1, Drydock #2, Pier 5 and the extension to the federal navigation channel. Maintenance dredging would include up to 180,000 CY on an as needed basis from various parts of the project area. Dredged material will be barged to a transfer area for disposal at Shirley Plantation or an alternative approved upland disposal location. This project may alter the Eastern Branch of the Elizabeth River portion of the Norfolk Harbor and Channels Federal Navigation Project (NHC-EBER). Comments should be received by the close of business on May 13, 2026.
  • NAO-2023-02265 (Daves Store Substation, Prince William County, Virginia)

    Expiration date: 6/5/2024

    The project site is located directly west of the Route I-66 and Lee Highway (VA State Route 29) interchange at 13714 Dave’s Store Lane in Prince William County, Virginia 20155. The project consists of the construction of a new 230 kV substation directly west of the existing Heathcote Transition Station to support data center development and overall forecasted demand for electrical service. The proposed project will result in impacts to 0.60-acre (29,893 square feet) of palustrine forested (PFO) wetlands and 0.08-acre (3,641 square feet) of palustrine emergent (PEM) wetlands from grading and fill for development of the substation footprint. Comments should be received by the close of business on June 5, 2024.

  • NAO-2020-00298-rdb (VMRC 20-1957)

    Expiration date: 3/6/2021

    The purpose of the proposed work is to provide connection from the existing portion of Summit School Road from its current terminus, south along a new alignment to connect with existing Telegraph Road, and to improve the existing Telegraph Road between Caton Hill Road and the Prince William Parkway.

  • PROPOSED ISSUANCE, REISSUANCE, AND/OR MODIFICATION OF THE NORFOLK DISTRICT REGIONAL PERMITS

    Expiration date: 4/22/2013

    The Norfolk District is proposing the issuance of two new Regional Permits (RP-01 and RP-02, formerly LOP-1 and LOP-2, respectfully) and the revision and reissuance of seven Regional Permits (RP-05, RP-15, RP-17, RP-18, RP-19, RP-20, and RP-22). All of the above-referenced permits are currently in effect, but will expire on August 14, 2013 with the exception of RP-05 and RP-20. RP-05 and RP-20 are set to expire on October 5, 2016 and May 25, 2017, respectfully.