Expiration date: 7/28/2023
The proposed project includes the dredging, a combination of new dredging and maintenance dredging, of approximately 136 acres (5,905,400 square feet), within the existing 3,960-foot long approach channel and 4,000-foot long turning basin/berthing area of the Virginia International Gateway (VIG) port terminal facility to deepen the existing area to achieve maximum depths of -58 feet MLLW. Public comments should be received by close of business Aug. 28, 2023.