Public Notice Distribution List

To be added to the Regulatory Branch Public Notice email distribution list, please send an email to Rod Desk at CENAO-.REG_ROD@usace.army.mil 

Results:
Tag: York
Clear
  • CENAO-WR-R NAO-99-2470

    Expiration date: 5/24/2017

    The applicant proposes to maintenance dredge the outboard slips and approaches of Pier R3 at U.S. Naval Weapons Station, Yorktown, Virginia. The projects involves maintenance dredging 96,480 square feet of subaqueous bottom to a maximum depth of – 44 feet mean low water, including overdredge. Each maintenance dredging event will remove approximately 76,600 cubic yards of material via clamshell dredge. The dredge material will be transported via bottom dump scow to be disposed of in the Norfolk Ocean Disposal site.

  • NAO-14-1391

    Expiration date: 3/9/2017

    The U.S. Coast Guard proposes modify an existing permit authorization to dredge approximately 89,257 cubic yards of material to a maximum depth of -10 feet below mean low water from approximately 296,208 square feet of subaqueous bottom within Wormley Creek and the York River. The project will realign the existing channel where Wormely Creek meets the York River, and create a channel to the existing boat ramp at the Coast Guard Training Center Yorktown. The dredged material from the channel will be removed by mechanical or hydraulic cutterhead dredge methods during the initial and future maintenance dredging cycles. The sandy dredged material from the entrance of the channel will be used as beach nourishment along the York River shoreline of the Coast Guard Training Center York, and the fine dredge material will be transported by bottom dump scow to the Wolftrap Alternate Placement Site within the Chesapeake Bay. The proposed permit modification will allow for the construction of a temporary access road to be used for the offloading and transportation of the sandy dredged material to be placed along the York River shoreline. The proposed access road will result in temporary impacts to 118,000 square feet of wetlands and/or waters, and those areas will be restored to pre-existing conditions upon completion of the project.

  • NAO-05-2862

    Expiration date: 5/27/2016

    The applicant proposes to construct a road extension and a parking lot modification associated with the existing Commonwealth Green development, which will result in impacts to 0.557 acres of non-tidal wetlands. The applicant proposes to offset those impacts through the purchase of 1.114 credits from an approved wetland mitigation bank.