Public Notice Distribution List

To be added to the Regulatory Branch Public Notice email distribution list, please send an email to Rod Desk at CENAO-.REG_ROD@usace.army.mil 

Results:
Tag: Mooring
Clear
  • 408-NAO-2026-0028 (700 Rosemont Ave New Mooring Dolphin)

    Expiration date: 4/30/2026

    Interested parties are hereby notified that a request for permission to alter a U.S. Army Corps of Engineers (USACE) federal project pursuant to Section 14 of the Rivers and Harbors Act of 1899, 33 U.S.C. 408 (Section 408) has been received and is under evaluation by the Norfolk District. This Section 408 request was submitted by Rosemont Property LLC to install a single 19-pile mooring dolphin along the existing bulkhead to support mooring operations along the Southern Branch of the Elizabeth River at 700 Rosemont Avenue, Chesapeake, VA. This project may alter the Norfolk Harbor and Channels Federal Navigation Project – Southern Branch of the Elizabeth River (NHC-SBER). Comments should be received by the close of business on April 30, 2026.
  • 408-NAO-2025-0054 (Bramwell Pier Project)

    Expiration date: 10/22/2025

    Interested parties are hereby notified that a request for permission to alter a U.S. Army Corps of Engineers (USACE) federal project pursuant to Section 14 of the Rivers and Harbors Act of 1899, 33 U.S.C. 408 (Section 408) has been received and is under evaluation by the Norfolk District. This Section 408 request was submitted by Mr. Gerald Bramwell to remove and replace an existing pier with a new pier and associated structures along Herbert's Creek (Sunset Creek) at 6 Cedar Point Drive in Hampton, Virginia. Floating finger piers will be installed to accommodate boat access. The proposed project will include (1) 88' x 6' and (2) 30' x 6' floating docks. There will be a 60' mooring location for 95K LB boat with (3) mooring pilings, a 20K LB boat lift in a 22' wet slip, and a modular floating kayak pier. This project may alter the Hampton Creek/Herbert’s Creek Federal Navigation Project. Comments should be received by the close of business on October 22, 2025.