Results:
Tag: highway
Clear
  • NAO-2016-01096

    Expiration date: 9/15/2016

    The proposed project is intended to increase capacity, eliminate roadway deficiencies, and improve safety along 1-64. This is the second segment (Segment II – approximately 7 miles) of a 75 mile section of I-64 that was evaluated with a Final Environmental Impact Statement conducted in 2013. Public comment period ends Sept. 15, 2016.

  • NAO-2013-1688

    Expiration date: 10/14/2013

    The Virginia Department of Transportation proposes to replace an existing 4-way signalized intersection with a grade-separated interchange. The purpose of the proposed project is to address safety and traffic operations related to the long-term traffic growth along US 29 and at the intersection of US 29/ Route 666 and provide an appropriate linkage between multiple classifications of roadways in Culpeper County, Va. Public comment period ends Oct. 14, 2013.