Public Notice Distribution List

To be added to the Regulatory Branch Public Notice email distribution list, please send an email to Rod Desk at CENAO-.REG_ROD@usace.army.mil 

Results:
Tag: DEQ
Clear
  • NAO-2012-771

    Expiration date: 2/12/2014

    The bank sponsor proposes to establish, design, construct, and operate a compensatory stream and wetland mitigation bank to be known as Potato Run Mitigation Bank The purpose of the mitigation bank is to provide off-site compensatory mitigation for projects that result in unavoidable impacts to wetlands and other Waters of the United States in the Rapidan Drainage basin. The goal of the bank is to provide mitigation credits for unavoidable impacts to Waters within the authorized service area.

  • NAO-2013-100

    Expiration date: 1/10/2014

    The proposed mitigation bank site is located on approximately 322.6 acres of mixed forested and pastured land. The site is located along Ravenscroft Road in Henry County, Va., (Lat N36.769312, Long W -79.783202). The proposed bank site is in the headwaters of Leatherwood Creek, which drains to the Smith River, a tributary of the Dan River. The bank sponsor proposes to establish, design, construct, and operate a compensatory wetland and stream mitigation bank to be known as Ravenscroft Stream Mitigation Bank. The goal of the bank is to protect and enhance water quality, as well as provide compensatory mitigation for authorized impacts within the authorized service area. The geographic service area of this mitigation bank would include the Roanoke River sub‐basin (HUC: 03010103). This proposed service area would include Henry, Patrick, Franklin, Pittsylvania, Halifax, Bedford, Roanoke, and Montgomery Counties and their associated Cities. The bank will consist of preservation of 4,941 linear feet (LF) of perennial streams, enhancement of 662 LF of perennial streams, and restoration of 8,347 LF of perennial streams. 681 SMU’s (4.4% of total credits) are generated from preservation and 14,878 SMU’s (95.6% of total credits) are generated from restoration and enhancement.

  • 07-SPGP-01 Annual Report

    The U.S. Army Corps of Engineers Norfolk District, in collaboration with the Virginia Department of Environmental Quality, announces the completion of the 2011-2012 07-SPGP annual report as well as an overall 07-SPGP-01 program summary report. The completed 07-SPGP-01 Annual Report is enclosed with this notice. If you have any questions about this notice, you may contact Anna Lawston at 540-937-4197 or via email at anna.r.lawston@usace.army.mil.

  • NAO-2006-5947

    Expiration date: 6/7/2013

    The north berth at Pier IX of the Kinder Morgan facility needs to be deepened to -52 feet MLLW in order to accommodate the larger PANAMAX vessels. Dredging is required to achieve the proposed depth of -52 feet MLLW. Public comment period ends June 7.