  • NAO-2017-01269

    Expiration date: 10/12/2019

    The city of Virginia Beach proposes to modify their individual permit for the dredging and placement of beach nourishment along Chesapeake and Ocean Park beachs. The modification will place an additional 350,000 cubic yards of sand material along the shoreline, resulting in additional impacts to approximately 6.5 acres of intertidal non-vegetated wetlands and 26.5 acres of subaqueous bottom.

  • NAO-2007-03405

    Expiration date: 8/6/2018

    This is a 15 day / Section 10 only PN for a modification request of an Individual Permit. The permitee, The City of Virginia Beach / Department of Public Works / c/o Mr. David Jarman is requesting a modification of their permit to allow a 360 LF wide X 20 LF long temporary wharf / bulkhead structure constructed in upland to remain in place. The structure is located on the western side of the Crab Creek Channel within the Lynnhaven River, Virginia beach, Virginia.

  • Lynnhaven Inlet Jetties Public Scoping Meeting

    Expiration date: 8/31/2015

    The U.S. Army Corps of Engineers and the city of Virginia Beach announce the initiation of the Lynnhaven Inlet Jetties Study and invite the public to attend a NEPA scoping meeting July 22, from 6-8 p.m., at the Frank W. Cox High School auditorium lobby, 2425 Shorehaven Drive, Virginia Beach, Virginia. Public comment period ends Aug. 31, 2015.
  • 12-1169-09

    Expiration date: 11/18/2012

    The applicant proposes to replace and upgrade the four-lane Route 60 “Lesner Bridge”, along Shore Drive over the Lynnhaven Inlet. The existing bridges will be removed, and each new bridge section will have two 12-foot-wide travel lanes, 10-foot-wide outside and 6-foot-wide inside shoulders, and a 10-foot multi-use path. The project will require the dredging of 2,530 cubic yards of subaqueous material for the installation of the 10 new instream bridge piers. It will also require, for construction access, the construction of a temporary bulkhead, the excavation of 10,200 cubic yards (20,425 square feet) of upland area, the dredging of 1,289 cubic yards (6,034 square feet) of nonvegetated intertidal area, the dredging of 2,511 cubic yards (37,437 square feet) of subaqueous bottom, and the maintenance dredging of 1,825 cubic yards (37,459 square feet) of the Crab Creek channel. All dredging for this mooring area will be to a depth of -8 feet at mean low water (MLW). Dredge material that is suitable for beach nourishment is proposed to be placed on the existing beach northwest of the bridge and landward of mean high water (MHW), and on City-owned property southwest of the bridge.