NAO-2014-0626

Published July 25, 2014
Expiration date: 8/25/2014

The district commander has received a joint application for federal and state permits as described below:

APPLICANT
Waterfront Marine
2809 Crusader Circle
Virginia Beach, Virginia 23453

WATERWAY AND LOCATION OF THE PROPOSED WORK:  The project is located in the Nottaway River, at Route 35, in Courtland, Virginia.

PROPOSED WORK AND PURPOSE:  The applicant proposes to complete a design build project that will replace the old truss steel bridge.  The modern bridge will be 902 feet in length and will be in the same location as the old bridge.  Demolition and construction operations will require access be installed across the river immediately adjacent to the existing bridge location.  This access is required to remove existing river spans and for the subsequent construction of the new river spans.  Temporary impacts have been significantly reduced by using a trestle over the wetlands and the river to conduct the work. The placement of the new bridge will result in 0.58 acres of permanent wetland impacts, while the construction access will result in temporary wetland impacts of 0.75 acres.  The purchase of wetland mitigation bank credits at a mitigation bank will provide compensation for permanent and temporary wetland impacts.

In addition to the required Department of the Army permit, the applicant must obtain a Virginia Water Protection Permit/401 certification from the Virginia Department of Environmental Quality assuring that applicable laws and regulations pertaining to water quality are not violated and a permit from the Courtland Wetlands Board.  Project drawings are attached.

AUTHORITY:  Permits are required pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403), Sections 401 and 404 of the Clean Water Act (Public Law 95-217) and Title 62.1 of the Code of Virginia.

FEDERAL EVALUATION OF APPLICATION:  The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest.  The decision will reflect the national concern for both protection and utilization of important resources.  The benefits which reasonably may be expected from the proposal must be balanced against its reasonably foreseeable detriments.  All of the proposal's relevant factors will be considered, including conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, flood plain values, land use classification, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.  The Environmental Protection Agency's "Guidelines for Specification of Disposal Sites for Dredged or Fill Material" will also be applied (Section 404(b)(1) of the Clean Water Act). 

The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the direct, indirect, and cumulative impacts of this proposed activity.  Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal.  To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above.  Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act.  Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.  Anyone may request a public hearing to consider this permit application by writing to the district commander within 30 days of the date of this notice, stating specific reasons for holding the public hearing.  The district commander will then decide if a hearing should be held.

Preliminary review indicates that:  (l) no environmental impact statement will be required; (2) after conducting the NAO ESA Project Review Process, no listed/proposed/candidate species and/or designated/proposed critical habitat under the Endangered Species Act of 1973 (16 U.S.C. 1531-1544, 87 Stat. 884), as amended) will be affected.  Based on this no effect determination, no further coordination with the Fish and Wildlife Service is required; and (3) no known properties eligible for inclusion or included in the National Register of Historic Places are in or near the permit area, or would likely be affected by the proposal.  Additional information might change any of these findings. 

For compliance with the Coastal Zone Management Act of 1972, as amended for projects located in Tidewater, the applicant must certify that federally licensed or permitted activities affecting Virginia's coastal uses or resources will be conducted in a manner consistent with the Virginia Coastal Zone Management Program (VCP) and obtain concurrence from the Department of Environmental Quality (DEQ), Office of Environmental Impact Review (OEIR). We have not received a certification from the applicant prior to publication of this public notice.  It is the applicant’s responsibility to submit a consistency certification to the Office of Environmental Impact Review for concurrence or objection and proof of concurrence must be submitted to the Corps prior to final permit issuance. A template federal consistency certification can be found here: http://www.deq.virginia.gov/Programs/EnvironmentalImpactReview/FederalConsistencyReviews.aspx#cert.  For more information or to obtain a list of the enforceable policies of the VCP, contact the Department of Environmental Quality, Office of Environmental Impact Review at 804-698-4330 or e-mail: ellie.irons@deq.virginia.gov or john.fisher@deq.virginia.gov.

The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996 (Public Law 104-267), requires all Federal agencies to consult with the National Marine Fisheries Service on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat (EFH).   Although the project area contains no Essential Fish Habitat (EFH), the Nottoway River contains juvenile and adult life stages of species including the Blueback herring (Alosa aestivalis), the Alewife (Alosa psuedoharengus), the American Shad (Alosa sapidissima), and the yellow perch (Perca flavescens).  The habitat which this project may adversely affect consists of shallow water.  The proposed project is described in Proposed Work and Purpose, above.  Our assessment of the project leads us to a preliminary determination that it will not have a substantial adverse effect on species and consultation is not required.  Our rationale for this preliminary determination is based on the expected short-term nature of the direct impacts/minimal increases in turbidity/changes in water temperature or salinity caused by the proposed work/the absence of vegetated wetlands, submerged aquatic vegetation, and anadromous fish spawning habitat/ existing poor water quality/unsuitable substrate.  In addition, the applicant has taken steps to mitigate potential effects: 1. Using a trestle so as not to work directly in the water, 2. Use of coffer dams directly around equipment and pilings, and 3. by adhering to time of year restrictions for this species and will not work in stream between February 15-June 15.  Based on comments from the National Marine Fisheries Service in response to this public notice, further EFH consultation may be necessary.

COMMENT PERIOD:  Comments on this project should be made in writing, addressed to the Norfolk District, Corps of Engineers (ATTN:  CENAO-WR-R), 803 Front Street, Norfolk, Virginia  23510-1096, and should be received by the close of business on Aug. 25, 2014.

PRIVACY & CONFIDENTIALITY:  Comments and information, including the identity of the submitter, submitted in response to this Public Notice may be disclosed, reproduced, and distributed at the discretion of the U.S. Army Corps of Engineers.  Information that is submitted in connection with this Public Notice cannot be maintained as confidential by the U.S. Army Corps of Engineers.  Submissions should not include any information that the submitter seeks to preserve as confidential.

If you have any questions about this project or the permit process, contact Stephen Decker at Stephen.j.decker@usace.army.mil or 757-201-7832.

FOR THE DISTRICT COMMANDER:

Stephen Decker
Environmental Scientist
Eastern Virginia Regulatory Section