  • Notice of Availability: Draft Finding of No Significant Impact and Draft Environmental Assessment

    Expiration date: 5/16/2022

    The United States Army is publishing this notice to announce the availability of the Draft Finding of No Significant Impact and Draft Environmental Assessment (EA) to make upgrades to the existing river water reservoir and outfall 40 cooling water channel at Holston Army Ammunition Plant (HSAAP) in Kingsport, Tennessee. The proposed action is needed to ensure safe and environmentally compliant manufacturing operations at HSAAP. This notice complies with Section 2(a)(4) of EO 11988 and Section 2(b) of EO 11990. The Army requests public comment to determine if there are any public concerns regarding the project’s potential impacts on wetlands and floodplains. The public comment period ends May 16, 2022.

  • NAO-2019-02026 (Dulles Toll Rd to GW Parkway improvement project)

    Expiration date: 5/2/2022

    The Lane Construction Corporation submitted a proposal for a construction project to improve a section of the I-495 corridor from Dulles Toll Road to the vicinity of the George Washington Memorial Parkway, comment period closes May 2.
  • NAO-2021-03224 / JPA # 21-V2393

    Expiration date: 4/29/2022

    The City of Newport News proposes to stabilize approximately 950 linear feet of eroding shoreline by installing (2) 170-foot offshore breakwaters, a 150-foot spur, discharging sand fill, planting vegetation, and performing minor bank grading. The project is located at Riverview Farm Park in Newport News along the shoreline of the Warwick River (37.08252°N; -76.53274°W).

  • NAO-2015-00459 (Cripple Creek Dredged Material Transfer Station)

    Expiration date: 4/18/2022

    The City of Virginia Beach proposes to impact wetlands and Waters of the U.S. for the construction of the Cripple Creek Dredged Material Transfer Station at 2540 Virginia Beach Boulevard, Virginia Beach, Virginia. The impacts are associated with the construction of 30 linear feet of bulkhead (with 23-foot returns), shoreline revetment, two 7-pile mooring dolphins and dredging for a basin to support the transfer of dredged material from barges to trucks. The bulkhead and fender would impact 90 square feet of non-vegetated tidal wetlands and 65 square feet of scrub/shrub vegetated tidal wetlands. The City of Virginia Beach would remove an estimated 625 cubic yards of dredged material from the proposed 4,350-square foot basin. The dredging (-7.5-foot NAVD) would impact 4,870 square feet of subaqueous bottom, and 495 square feet of non-vegetated wetlands in the 2X buffer and 390 square feet of vegetated wetlands (240 square feet in 2x and 150 square feet in 4X buffer). Public comments should be received by the close of business on April 18, 2022.

  • NAO-2020-1000 (Bremo Bluff Power Station)

    Expiration date: 3/24/2022

    Virginia Electric and Power Company proposed to construct a and operate a new fossil fuel combustion products management facility that would facilitate the mandated closure of the coal combustion residual (CCR) surface impoundment at the Bremo Bluff Power Station located in Fluvanna County, Virginia. Public comments should be received by the close of business on March 24, 2022.