NAO-2024-02166 (Colonna Shipyard, Norfolk, Virginia)

U.S. Army Corps of Engineers Norfolk District
Published Sept. 11, 2024
Expiration date: 10/11/2024

CENAO-WRRE                                                                

NAO-2024-02166

 

FEDERAL PUBLIC NOTICE

The District Commander has received a joint permit application for Federal and State permits as described below:

APPLICANT
Colonna Shipyard

Mark Essert, Director of Operations

400 East Indian River Road

Norfolk, VA 23523

 

 

 

PROJECT LOCATION:  Eastern Branch Elizabeth River from Norfolk Harbor-Town Point reach (Sta 5+50) to the Norfolk Southern Railway Draw Bridge (Sta 60+00)

 

PROJECT SIZE: 53.61 ACRES

 

NEAREST WATERWAY: Eastern Branch Elizabeth River

 

LATITUDE AND LONGITUDE: 36.841528, -76.286317

 

PROJECT DESCRIPTION AND PURPOSE:  Colonna Shipyard is proposing to perform new and future maintenance dredging by mechanical methods to deepen the 5,450 foot federal channel on the Eastern Branch of the Elizabeth River in Norfolk, Virginia to provide safer ingress/egress to deeper draft vessels.

This project includes the following activities:  (1) the new work dredging to deepen approximately 5,450 feet of the authorized Eastern Branch Elizabeth River federal channel from the Norfolk Harbor-Town Point reach (Sta 5+50) to the Norfolk Southern Railway Draw Bridge (Sta 60+00) for an approximate total of 53.61 acres to a maximum depth of -37 ft MLLW (2) approximately 556,700 cubic yards of dredged material is proposed to be removed and barged to Craney Island Rehandling Basin,  and/or an approved upland disposal location (3) the future maintenance dredging of the entire 53.61 acres, on an as-needed basis- within the time limit and conditions of the permit, in order to maintain the maximum depth of -37 ft MLLW of the  Eastern Branch Elizabeth River federal channel.

 

 

AVOIDANCE AND MINIMIZATION:  The proposed dredging footprint has been designed to limit the impacts and will not impact wetlands, submerged aquatic vegetation, or shallow water habitat.

 

COMPENSATORY MITIGATION: Compensatory mitigation is not proposed.

 

In addition, the applicant must obtain an Individual Section 401 Water Quality Certification or waiver from the Virginia Department of Environmental Quality (DEQ) assuring that applicable laws and regulations pertaining to water quality are not violated.  

 

A copy of the joint permit application can be found on the Virginia Marine Resources Commission’s website (hyperlink).

 

AUTHORITY:

(X)      Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403).

(X)      Sections 401 and 404 of the Clean Water Act (Public Law 95-217) and

          Title 62.1 of the Code of Virginia.

( )       Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972

          (33 U.S.C. 1413).

(X)      Section 14 of the Rivers and Harbors Act of 1899 (33 U.S.C. 408 (Section 408)).

 

FEDERAL EVALUATION OF APPLICATION:  The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest.  The decision will reflect the national concern for both protection and utilization of important resources.  The benefits which reasonably may be expected from the proposal must be balanced against its reasonably foreseeable detriments.  All of the proposal's relevant factors will be considered, including conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, flood plain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.  The Environmental Protection Agency's "Guidelines for Specification of Disposal Sites for Dredged or Fill Material" will also be applied (Section 404(b)(1) of the Clean Water Act).

 

The Corps of Engineers is soliciting comments from the public, federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the direct, indirect, and cumulative impacts of this proposed activity.  Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition, or deny a permit for this proposal.  To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above.  Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement (EIS) pursuant to the National Environmental Policy Act.  Preliminary review of the application indicates that no EIS will be required.

Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.  Anyone may request a public hearing to consider this permit application by writing to the District Commander within 30 days of the date of this notice, stating specific reasons for holding the public hearing.  The District Commander will then decide if a hearing should be held.

 

ENDANGERED SPECIES: After conducting the Norfolk District Endangered Species Act (ESA) Project Review Process, the Corps has made the preliminary determination that:

 

There may be an effect to listed/proposed/candidate species and/or designated/proposed critical habitat under the ESA of 1973. The U.S. Fish and Wildlife Service (FWS) Information and Planning and Consultation (IPaC) Official Species List and Species Conclusion Table are attached for review and comment by the FWS and the National Marine Fisheries Service (NMFS).

 

Additional information might change any of these findings.

 

HISTORIC AND CULTURAL RESOURCES:

Historic Resources eligible for inclusion or included in the National Register of Historic Places (NRHP) are in or near the Corps permit area or would likely be affected by the proposal.

Additional information may change any of these findings.

 

ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996 (Public Law 104-267), requires all Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat (EFH).

 

The Elizabeth River contains EFH for the egg, juvenile, neonate, and/or adult life stages of 9 species including Atlantic Herring, Red Hake, Clearnose Skate, Windowpane Flounder, Sandbar Shark, Bluefish, Atlantic Butterfish, Summer Flounder, and Black Sea Bass. The habitat which this project would affect consists of open water. The proposed project is described in Proposed Work and Purpose, above. Our assessment of the project leads us to a preliminary determination that it will not have a substantial adverse effect on EFH and therefore expanded EFH consultation is not required.  Our rationale for this preliminary determination is based on the expected short-term nature of the direct impacts/minimal increases in turbidity/changes in water temperature or salinity caused by the proposed work/the absence of vegetated wetlands, submerged aquatic vegetation, and anadromous fish spawning habitat/ existing poor water quality/unsuitable substrate. Based on comments from the NMFS in response to this public notice, further EFH consultation may be necessary.

 

VIRGINIA’S COASTAL ZONE MANAGEMENT PROGRAM: For compliance with the Coastal Zone Management Act of 1972, as amended for projects located in Virginia’s Coastal Zone, the applicant must certify that federally licensed or permitted activities affecting Virginia's coastal uses or resources will be conducted in a manner consistent with the Virginia’s Coastal Zone Management Program (Virginia CZM Program), and obtain concurrence from the Department of Environmental Quality (DEQ), Office of Environmental Impact Review (OEIR). It is the applicant’s responsibility to submit a consistency certification to the OEIR for concurrence or objection, and proof of concurrence must be submitted to the Corps prior to final permit issuance. A template federal consistency certification can be found in the Federal Consistency Manual here: https://www.deq.virginia.gov/our-programs/environmental-impact-review/federal-consistency.

 

For more information or to obtain a list of the enforceable policies of the Virginia CZM Program, contact the DEQ-OEIR at (804) 659-1915 or e-mail: bettina.rayfield@deq.virginia.gov.

 

The applicant has not submitted concurrence.

 

SECTION 408: The Norfolk District Operations Branch has determined that the proposed activity may require permission to alter a U.S. Army Corps of Engineers (USACE) project pursuant to Section 14 of the Rivers and Harbors Act of 1899 (33 U.S.C. 408 (Section 408)). Interested parties are hereby notified this request for permission to alter the Eastern Branch Elizabeth River portion of the Norfolk Harbor and Channels Federal Navigation Project has been received and will be evaluated by the Norfolk District. Written comments, including any objections to the proposed alteration, stating reasons therefor, are being solicited from anyone having an interest in the requested alteration. The authority to grant permission for temporary or permanent use, occupation, or alteration of any USACE civil works project is contained in Section 14 of the Rivers and Harbors Act of 1899. Section 408 authorizes the Secretary of the Army to grant permission for the alteration or occupation or use of a USACE project if the Secretary determines that the activity will not be injurious to the public interest and will not impair the usefulness of the project. Comments specific this Section 408 review should be submitted directly to katy.r.damico@usace.army.mil and copied to nao.section408@usace.army.mil and the Regulatory contact noted in the Comment Period section below.

 

VIRGINIA’S SECTION 401 WATER QUALITY CERTIFICATION PROGRAM: The Clean Water Act (CWA) Section 401 Certification Rule (Certification Rule, 40 CFR 121), effective September 11, 2020, requires certification, or waiver, for any license or permit that authorizes an activity that may result in a discharge. The scope of a CWA Section 401 certification is limited to ensuring that a discharge from a Federally licensed or permitted activity will comply with water quality requirements. To comply with the Virginia Section 401 Water Quality Certification Program and the Certification Rule, the applicant is responsible for adhering to the procedures outlined in the Certification Rule when requesting certification from the certifying authority, the Virginia Department of Environmental Quality. In accordance with Certification Rule part 121.12, the Corps will notify the U.S. Environmental Protection Agency Administrator when it has received a Department of the Army (DA) permit application and the related certification. The Administrator is responsible for determining whether the discharge may affect water quality in a neighboring jurisdiction. The DA permit may not be issued pending the conclusion of the Administrator’s determination of effects on neighboring jurisdictions.

 

COMMENT PERIOD:  Comments on this project should be in writing and can be sent by either email to autumn.m.crawford@usace.army.mil , or by regular mail, addressed to the Norfolk District, Corps of Engineers (ATTN:  CENAO-WRRE), 803 Front Street, Norfolk, VA  23510-1011, and should be received by the close of business on October, 11, 2024.

 

PRIVACY AND CONFIDENTIALITY:  Comments and information, including the identity of the submitter, submitted in response to this Public Notice may be disclosed, reproduced, and distributed at the discretion of the U.S. Army Corps of Engineers.  Information that is submitted in connection with this Public Notice cannot be maintained as confidential by the U.S. Army Corps of Engineers.  Submissions should not include any information that the submitter seeks to preserve as confidential.

 

If you have any questions about this project or the permit process, contact Ms. Autumn Crawford, autumn.m.crawford@usace.army.mil, AND 757-289-1426.

 