  • NAO-2021-02234 (Back Mountain Mitigation Bank)

    Expiration date: 1/16/2022

    The Sponsor proposes to establish, design, construct, and operate a wetland and stream compensatory mitigation site known as the Back Mountain Mitigation Bank (BMMB). The purpose of the compensatory mitigation project is to provide off-site compensatory mitigation for projects that result in unavoidable impacts to wetlands and streams and other waters of the United States.

  • NAO-2021-01481

    Expiration date: 1/8/2022

    Nova 1 Owner, LLC proposes to develop Project “Celtics,” a data center campus and associated infrastructure, along the eastern side of Sycolin Road, north of Dulles Greenway (VA-267) in Loudoun County, Virginia, with permanent impacts to 2,588 linear feet of stream channel, 0.54 acre of palustrine forested wetlands (PFO); and, temporary impacts to 79 linear feet of stream channel, which require 1.08 wetland credits and 3,116 stream credits as compensation from an approved mitigation bank serving the project site watershed (Hydrologic Unit Code 02070008).

  • NAO-2020-1000

    Expiration date: 1/3/2022

    Virginia Electric and Power Company proposed to construct and operate a new fossil fuel combustion products management facility that would facilitate the mandated closure of the coal combustion residual (CCR) surface impoundment at the Bremo Bluff Power Station located in Fluvanna County, Virginia. The public notice comment period ends on January 3, 2022.

  • NAO-2020-00707

    Expiration date: 12/31/2021

    The sponsor proposes to establish, design, construct and operate a compensatory stream mitigation site to be known as the South Anna River at Ashland Mill Dam Mitigation Bank, to provide off-site compensatory mitigation for projects that result in unavoidable impacts to streams and other waters of the United States in the Pamunkey River and Lower Chesapeake Bay Drainage Basins.

  • Norfolk Harbor Meeting Area Draft Validation Report/Supplemental Environmental Assessment

    Expiration date: 12/19/2021

    The U.S. Army Corps of Engineers, and the Commonwealth of Virginia, acting through its agent, the Virginia Port Authority, announce the release of the Draft Validation Report/Supplemental Environmental Assessment, prepared pursuant to the National Environmental Policy Act, which is open for comment through Dec. 19.