Wall prep
FORT LEE, Va. --A contractor prepares a pre-fabricated exterior wall to be lifted by crane into place at the Fort Lee Advanced Individual Training Phase II project, June 6, 2014. The project includes a five-story, 300-person addition to an existing barracks building, as well as a separate five-story, 600-person barracks facility. (U.S. Army photo/Patrick Bloodgood)

Download Image: Full Size (1.6 MB)
Photo by: Patrick Bloodgood |  VIRIN: 140606-A-OI229-005.JPG