amended 22_SPGP_LT Public Notice

U.S. Army Corps of Engineers Norfolk District
Published Dec. 20, 2022
Expiration date: 6/22/2023

December 20, 2022

CENAO-WR-R

22-SPGP-LT (2022-00286)

 

Administrative Correction

2022 State Programmatic General Permit- Linear Transportation (22-SPGP- LT)

 

The U.S. Army Corps of Engineers - Norfolk District (Corps) announces an administrative correction to the 22-SPGP- LT.  The 22-SPGP- LT was issued on August 4, 2022 and went into effect on August 8, 2022. Via this public notice we announce a correction to the wetland mitigation statement in Section II(b)(4) to properly reflect the 22-SPGP-LT compensation requirements, which are also listed in General Condition 21.

Summary of Change:

Page 2; Section II(b)(4):

A compensatory mitigation plan for all projects where the permanent loss exceeds 0.1 acre of wetlands and/or 0.03 acre of stream bed or 300 linear feet of stream bed. Stream channel loss must be reported in acreage and linear feet.

Is changed to:

A compensatory mitigation plan for all projects proposing any permanent loss of wetlands and/or 0.03 acre of stream bed or 300 linear feet of stream bed. Stream channel loss must be reported in acreage and linear feet.

The revised SPGP-LT is attached and can be located on our website at: https://www.nao.usace.army.mil/Missions/Regulatory/RBregional.aspx

If you have any questions about the revised 22-SPGP-LT or the general permit process, contact Ms. Anna Lawston by telephone at 540-764-4459 or email at anna.r.lawston@usace.army.mil.

 

Attachment:

Revised 22-SPGP-LT permit