Public Notice Distribution List

To be added to the Regulatory Branch Public Notice email distribution list, please send an email to Rod Desk at CENAO-.REG_ROD@usace.army.mil 

Results:
Archive: June, 2025
Clear
  • NAO-2024-2627 (Southeast Supply Enhancement Project, Pittsylvania County, Virginia)

    Expiration date: 7/28/2025

    Transcontinental Gas Pipe Line proposes to construct the Southeast Supply Enhancement Project consisting of the installation of 55.3 miles of 42-inch-diameter natural gas pipeline (Virginia and North Carolina), additions to compression facilities (Virginia and North Carolina) and facility modifications (North Carolina, South Carolina, Georgia, and Alabama). The subject of this notice is specific to the actions of SSEP requiring a DA permit under the provisions of Section 404 of the Clean Water Act, which consists of the proposal to construct 55.3 miles of natural gas pipeline known as the Salem and Eden Loops located in North Carolina and Virginia. The Wilmington District will receive written comments on the proposed work, as outlined above, pertaining to both the Wilmington District and Norfolk District areas of responsibility, until July 28, 2025.
  • NAO-2014-00851 (Wetland and Stream Replacement Fund In Lieu Fee Program, Richmond, Virginia )

    Expiration date: 7/28/2025

    The Commonwealth of Virginia, Department of Environmental Quality is proposing to develop an In-Lieu Fee Compensatory Mitigation Program referred to as “Wetland and Stream Replacement Fund In-Lieu Fee Mitigation Program” pursuant to Title 33 Code of Federal Regulations, Section 332. Comments should be received by the close of business on July 28, 2025.
  • Nationwide Permit Reissuance Public Notice Request

    Expiration date: 8/4/2025

    On June 18, 2025, the U.S. Army Corps of Engineers (Corps) published in the Federal Register its proposal to reissue 56 existing nationwide permits (NWPs) and issue one new NWP. One NWP is not proposed for reissuance. NWPs are general permits issued on a nationwide basis to streamline the authorization of activities that result in no more than minimal individual and cumulative adverse environmental effects. Many of the proposed NWPs require notification to the district engineer before commencing those activities, to ensure that the activities authorized by those NWPs cause no more than minimal individual and cumulative adverse environmental effects.  
  • NAO-2024-02685

    Expiration date: 7/16/2025

    Amazon Data Services, Inc. has proposed to construct the first phase of a two-lane public road to be known as Green Bay Farm Road which will provide through access between Route 33 and Mt. Airy. Proposed impacts are for the construction of the road, associated stormwater management facilities, and erosion and sediment control measures.

  • Joint Public Notice: Notice of Availability of the Regional Streamflow Duration Assessment Methods for the Northeast and Southeast

    The U.S. Army Corps of Engineers (Corps) Baltimore, Buffalo, Charleston, Chicago, Detroit, Fort Worth, Galveston, Huntington, Jacksonville, Kansas City, Little Rock, Louisville, Memphis, Mobile, Nashville, New England, New Orleans, New York, Norfolk, Philadelphia, Pittsburgh, Savannah, St. Louis, Tulsa, Vicksburg, and Wilmington Districts, and the U.S. Environmental Protection Agency (EPA), Regions 1, 2, 3, 4, 5, 6, and 7 jointly announce the availability of the Regional Streamflow Duration Assessment Methods (Regional SDAMs) for the Northeast and Southeast (dated June 12, 2025). The methods are rapid assessment tools to help distinguish between ephemeral, intermittent, and perennial streamflow at the reach scale for the Northeast and Southeast SDAM Regions.