  • NAO-2014-0100

    Expiration date: 3/9/2014

    The bank sponsor, John Shepherd, proposes to establish, design, construct, and operate a compensatory stream mitigation bank to be known as Windrow Farm Stream Mitigation Bank. The bank will be located on approximately 133 acres in Nottoway County, Va. The purpose of the mitigation bank is to provide off-site compensatory mitigation for projects that result in unavoidable impacts to streams in the Middle James River Drainage basin.

  • NAO-2013-01660

    Expiration date: 9/30/2013

    The site sponsor proposes to design, construct, and steward a 134 acre compensatory stream mitigation site which is known as SH-6 Shenandoah River (Cedar Creek Battlefield) VARTF. The purpose of the mitigation project is to provide off-site compensatory mitigation for projects that result in unavoidable impacts to stream and other waters of the United States in the Shenandoah River Drainage basin. Public comment period ends Sept. 30, 2013.

  • NAO-2007-2060 (VMRC 12-1865)

    Expiration date: 2/28/2013

    The city has proposed to construct a regional, dual purpose water quality and flood control best management practice (BMP) called the Richneck Regional Water Quality Retrofit and Flood Control BMP Project. The purpose of the project is to reduce the Total Maximum Daily Load (TMDL) of nitrogen, phosphorus, and sediment loads; and to reduce property damage from repeated flood events within the Stoney Run watershed.