Results:
Tag: National Environmental Policy Act
Clear
  • Notice of Availability: Draft Finding of No Significant Impact / Environmental Assessment New River Water Intake Structure and Pump House at Holston Army Ammunition Plant, Tennessee

    Expiration date: 4/14/2023

    The United States Army is publishing this notice to announce the availability of the Draft Finding of No Significant Impact (FNSI) and Draft Environmental Assessment (EA) to construct a new river water intake structure and pump house in Area B at Holston Army Ammunition Plant (HSAAP). The purpose of the proposed action is to construct a new intake structure and associated pump house to meet Rule 316(b) requirements while providing adequate capacity for water intake at full RDX/HMX production capacity. The Draft FNSI, Draft EA, and Draft FNPA are available for review for 30 days with all comments due on or before April 14, 2023.

  • Notice of Availability: Draft Finding of No Significant Impact and Draft Environmental Assessment

    Expiration date: 5/16/2022

    The United States Army is publishing this notice to announce the availability of the Draft Finding of No Significant Impact and Draft Environmental Assessment (EA) to make upgrades to the existing river water reservoir and outfall 40 cooling water channel at Holston Army Ammunition Plant (HSAAP) in Kingsport, Tennessee. The proposed action is needed to ensure safe and environmentally compliant manufacturing operations at HSAAP. This notice complies with Section 2(a)(4) of EO 11988 and Section 2(b) of EO 11990. The Army requests public comment to determine if there are any public concerns regarding the project’s potential impacts on wetlands and floodplains. The public comment period ends May 16, 2022.

  • NAO-2013-2330

    Expiration date: 4/22/2014

    The Virginia Department of Transportation,or VDOT, proposes to improve the interchange located at Exit 310 Interstate 81, south of Winchester in Frederick County, Va. The work will occur in tributaries to Opequon Creek and Hoge Run.

  • EA for Millennium Area Headstone Removal Project

    Expiration date: 12/7/2012

    This Environmental Assessment was prepared to assess the potential impacts of the Millennium Area Headstone Removal Project on property administered by Arlington National Military Cemeteries and National Park Service property at Arlington County, Va. The purpose of the project is to remove all headstones being currently used as stream stabilization within ANC and NPS-administered property, while providing stabilization measures adequate to ensure that the system is not degraded. This project would remove the headstones and dispose of them properly. Public comment period ends Nov. 2, 2012.

  • NAO-2001-2350; 12-V0719

    Expiration date: 9/14/2012

    The applicant proposes to discharge fill material in 0.08 acre of palustrine scrub-shrub wetlands to construct a permanent access road to an existing regional storm water management facility located within the project limits. Cumulative impacts to waters of the U.S. for the development of Northlake Industrial Park are approximately 2.7 acres. The public comment period ends Sept 14, 2012.