Public Notice Distribution List

To be added to the Regulatory Branch Public Notice email distribution list, please send an email to Rod Desk at CENAO-.REG_ROD@usace.army.mil 

Results:
Tag: widening
Clear
  • NAO-2017-00129

    Expiration date: 5/19/2017

    The applicant proposes to widen and reconstruct 1.9 miles of Route 630 from 800 feet west of its intersection with Ramouth Church (Route 628) to Route 732 (Cedar Lane). In addition to widening to four lanes, the proposed project also includes turn lanes, the realignment of the Route 628 (Ramouth Church & Winding Creek)/Route 630 intersection, construction of stormwater management facilities construction, and a shared use path along the westbound lane and a sidewalk along portions of the eastbound lane to accommodate pedestrian access to Colonial Forge High and Winding Creek Elementary schools.

  • NAO-2015-1785 Military Highway improvements

    Expiration date: 3/29/2016

    The applicant proposes to improve an approximately 1.58 mile corridor along Military Highway (US Route 13 and State Route 165) and Northhampton Boulevard (US Route 13 and State Route 166) to upgrade highway safety and efficiency. Proposed improvements include widening of Military Highway from a four lane roadway to a six and eight land divided roadway with a curb, gutter, and sidewalk; widening of Northampton Boulevard and Princess Anne Road from a four lane roadway to a six lane divided roadway with curb, gutter, and sidewalk; installation of a Continuous Flow Intersection at the intersection of Military Highway, Northampton Boulevard, and Princess Anne Road; and attendant required storm water management features. Public comment period ends March 29, 2016.

  • NAO-2006-05982 Princess Anne Road widening

    Expiration date: 10/15/2015

    The City of Virginia Beach proposes the widening of a segment of Princess Anne Road (Phase VII) from General Booth Boulevard to Sandbridge Road/Upton Drive from a 2-lane road to a 4-lane road with median and shared multi-use paths on both sides of the road. The roadway improvements will extend further east along Sandbridge Road for approximately 0.5 miles where the road widening will merge into the existing 2-lane road. Public comment period ends Oct. 15, 2015.