Results:
Tag: I-64
Clear
  • NAO-2023-00311 (I-64 Gap A, New Kent County, Virginia)

    Expiration date: 5/9/2024

    Construction of additional travel lanes along I-64 in the first of three “Gap” segments that will adjoin segments of I-64 that have a minimum of six travel lanes. The proposed addition of a third travel lane in each direction will increase connectivity between Richmond and Hampton Roads. Public comments should be received by the close of business on May 9, 2024.
  • NAO-1994-1166

    Expiration date: 10/24/2019

    Hampton Roads Connector Partners proposes to expand Interstate 64 in Virginia, including the Hampton Roads Bridge-Tunnel, from Settlers Landing Road in Hampton to the I-564 interchange in Norfolk. The total project length is about 9.9 miles, 1.8 miles of which is proposed tunnel and island expansion. The project will permanently impact 18.92 acres of subaqueous bottom, 0.4 acres of submerged aquatic vegetation, 3.75 acres of tidal wetlands and 0.86 acres of nontidal wetlands.

  • NAO-2016-01096

    Expiration date: 9/15/2016

    The proposed project is intended to increase capacity, eliminate roadway deficiencies, and improve safety along 1-64. This is the second segment (Segment II – approximately 7 miles) of a 75 mile section of I-64 that was evaluated with a Final Environmental Impact Statement conducted in 2013. Public comment period ends Sept. 15, 2016.

  • NAO-2015-1785 Military Highway improvements

    Expiration date: 3/29/2016

    The applicant proposes to improve an approximately 1.58 mile corridor along Military Highway (US Route 13 and State Route 165) and Northhampton Boulevard (US Route 13 and State Route 166) to upgrade highway safety and efficiency. Proposed improvements include widening of Military Highway from a four lane roadway to a six and eight land divided roadway with a curb, gutter, and sidewalk; widening of Northampton Boulevard and Princess Anne Road from a four lane roadway to a six lane divided roadway with curb, gutter, and sidewalk; installation of a Continuous Flow Intersection at the intersection of Military Highway, Northampton Boulevard, and Princess Anne Road; and attendant required storm water management features. Public comment period ends March 29, 2016.

  • NAO-2011-0462 I-64 Capacity Improvements

    Expiration date: 10/2/2015

    Shirley Contracting Company, LLC has proposed the I-64 Capacity Improvements, which will include widening the existing Interstate 64 in Newport News, Virginia from a four lane interstate, to a six lane interstate from 0.50 miles east of Yorktown Road (Route 238 interchange) and ending 1.55 miles west of Jefferson Avenue (Route 143 interchange).