US Army Corps of Engineers
Norfolk District Website

Results:
Tag: Buchanan County
Clear
  • NAO-2021-00197/21-V0257

    Expiration date: 4/26/2021

    WATERWAY AND LOCATION OF THE PROPOSED WORK:  The project is located in the Levisa Fork River and tributary streams, near Grundy, Virginia. PROPOSED WORK AND PURPOSE:  The applicant proposes to construct 1.78 miles of new roadway, dually designated U.S. Highway 121/460-Poplar Creek Phase B.  The road will consist of 2 lanes with truck climbing lanes where necessary.  The project is proposed to extend from the east end of the dually designated U.S. 121/460 Poplar Creek Phase A Section, near State Route 604 (Poplar Creek Road), that is currently under construction to U.S. Route 460 near Grundy, VA.  Due to the mountainous terrain, road construction will require removal of a large amount of material to establish a suitable road alignment in the terrain.  Some of this material will be utilized as road fill but a large amount of excess fill material will require disposal.  This excess material will be disposed of in a valley resulting in stream impacts and utilize an existing disposal site permitted as part of the Phase A construction.

  • NAO-2004-02863

    Expiration date: 4/3/2020

    The Black Diamond Company proposes to fill approximately 430 linear feet of stream bed in support of expanding the currently operating Stateline Branch Refuse Facility. Specifically, this site would allow permanent placement of approximately 7,100,855 cubic yards of coarse refuse from the applicant’s coal preparation plant extending the life of the operation over the next 8 to 9 years. The project is located in an unnamed tributary of Stateline Branch, a tributary to the Upper Levisa, Big Sandy River, at Big Rock, Buchanan County, Virginia..

  • NAO-2017-00044

    Expiration date: 9/6/2017

    The applicant proposes to construct Section IIIB-Phase A of US Highway 121, which overlaps Corridor Q, and will be dual designated as US 460/121. The project involves construction of 2.8 miles of two-lane rural principal arterial highway on new alignment, with truck climbing lanes at some locations, and will cross Poplar Creek with a box culvert over which will be placed excavated material from elsewhere on the project. Proposed permanent impacts are 0.22 acres wetlands, 0.23 acres open water, 3,530 linear feet perennial streams, and 1,160 linear feet intermittent streams.

  • CENAO-WRR NAO-2014-01061

    Expiration date: 4/7/2017

    NAO-2017-01016: Highland Conservation Group inc, proposes to establish, design, construct, and operate a wetland and stream compensatory mitigation bank to provide off-site compensatory mitigation for projects that result in unavoidable impacts to wetlands and streams within the specified geographic service area. The proposed mitigation bank, is approximately 490 acres of land within the Upper Russell Fork River watershed, Buchanan County, Virginia. The public comment period ends April 7, 2017.

  • NAO-2013-1972

    Expiration date: 5/18/2014

    Bizzack Construction, LLC proposes to construct as a Design-Build project, a 6.2 mile-long four-lane, median divided, rural principal arterial highway (US Route 460) on new alignment and a new connection to State Route 609 at Bull Gap. Public comment period ends May 18.