Public Notice Distribution List

To be added to the Regulatory Branch Public Notice email distribution list, please send an email to Rod Desk at CENAO-.REG_ROD@usace.army.mil 

NAO-2017-00248

Published Feb. 28, 2017
Expiration date: 3/30/2017
FEDERAL PUBLIC NOTICE

The District Engineer received a prospectus to establish a wetland and stream compensatory mitigation site for Federal and State permits as described below:

BANK SPONSOR

Tillman Conservation, LLC

4638 Variety Mills Rd

Arrington, VA 22922


WATERWAY AND LOCATION OF THE PROPOSED WORK: The proposed mitigation site is approximately 400 acres located on an approximately 860 acre parcel that is currently being used for hay production, livestock, and forestland. The site is located within the Tye River watershed, a tributary to the James River, in Nelson County, Virginia. 
 

PROPOSED WORK AND PURPOSE:  The sponsor proposes to establish, design, construct, and operate a compensatory stream mitigation site to be known as the Tye River Mitigation Bank. The purpose of the mitigation project is to provide off-site compensatory mitigation for projects that result in unavoidable impacts to streams and other waters of the United States in the Middle James River watershed. 

The Sponsor plans to reestablish stream stability and capacity to transport watershed flows and sediment load on 1,000 linear feet of stream channel and reestablish a wider riparian corridor (200 feet wide) on 22,676 linear feet of unnamed perennial and intermittent tributaries. 

The sponsor proposed, for purposes of Section 404 of the Clean Water Act, that the geographic service area of this mitigation site would include the National Watershed Boundary Dataset Hydrologic Unit Codes (HUC’s), in part, 02080203 and 02080205. These HUC’s include all or parts of Bedford, Amherst, Campbell, Appomattox, Nelson, Albemarle, Buckingham, Fluvanna, Goochland, Henrico, and Powhatan Counties.  

Oversight of this mitigation site would be by an existing group of federal and state agency representatives. This interagency oversight group is known as the Interagency Review Team (IRT). The Norfolk District of the U.S. Army Corps of Engineers and the Virginia Department of Environmental Quality chair the IRT. 

This mitigation site may be one of a number of practicable options available to applicants to compensate for unavoidable stream impacts associated with permits issued under the authority of Section 404 and 401 of the Clean Water Act (Public Law 95-217) in Virginia. 

The actual approval of the use of this mitigation site for a specific project is the decision of the Corps pursuant to Section 404 of the Clean Water Act and/or by the Department of Environmental Quality pursuant to Section 401 of the Clean Water Act and Title 62.1 of the Code of Virginia. The Corps and the Department of Environmental Quality provide no guarantee that any particular individual or general permit will be granted authorization to use this mitigation site to compensate for unavoidable wetland impacts associated with a proposed permit. Authorization by the Virginia Marine Resources Commission may also be required for its use for specific projects.

 AUTHORITY: Issuance of a public notice regarding proposed mitigation sites is required pursuant to the “Compensatory Mitigation for Losses of Aquatic Resources; Final Rule,” (Rule) as published in the April 10, 2008, Federal Register, Vol. 73, No. 70, Pages 19594-19705 (33 CFR Parts 325 and 332). 

FEDERAL EVALUATION OF PROPOSAL: The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate this proposed mitigation site. This is not an application for work in Waters of the United States.  The Corps of Engineers in evaluating this proposal will consider any comments received. Comments are used to assess impacts on endangered species, historic properties, water quality, conservation, economics, aesthetics, general environmental concerns, wetlands, fish and wildlife values, flood hazards, flood plain values, land use classification, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, and consideration of property ownership.   

Preliminary review indicates that: (1) no environmental impact statement would be required; (2) after conducting the NAO ESA Project Review Process, there may be an affect to species listed under the Endangered Species Act of 1973 and the Official Species List and Species Conclusion Table is attached for review and comment by the U.S. Fish and Wildlife Service; and (3) no known properties eligible for inclusion or included in the National Register of Historic Places are in or near the permit area, or would likely be affected by the proposal. Additional information might change any of these findings. 

COMMENT PERIOD: Comments on this project should be made in writing, addressed to the Norfolk District, Corps of ngineers-(ATTN:  Charlottesville Field Office), Mr. Vinny Pero, at the address below, and should be received by the close of business on March 30, 2017. The Prospectus and Drawings can be viewed at https://ribits.usace.army.mil/.

If you have any questions about this mitigation site, please contact:

 Mr. Vinny Pero

920 Gardens Blvd., Suite103-B

Charlottesville, Virginia 22901

434.973.0568

vincent.d.pero@usace.army.mil