Results:
Tag: flood pool level
Clear
  • July

    Controlled flood release ends at Gathright Dam

    Gathright Dam near Covington, Virginia will end its controlled flood storage release today. Beginning this morning at 9 a.m., operators at the dam will begin to reduce the release, which is currently at 1,530 cubic feet per second, to 600 cubic feet per second by 11 a.m.
  • June

    Gathright Dam conducts controlled flood release

    The Norfolk District, U.S. Army Corps of Engineers began a controlled flood release at Gathright Dam near Covington, Virginia at 9 a.m. today. The flow will gradually increase from 1,210 cubic feet per second to 3,500 cubic feet per second by 1 p.m.