Results:
Tag: hydrology
Clear
  • February

    Builders of Bulwark: Norfolk H&H engineer illustrates the heart, path of a problem-solver

    There are creative kids who want to produce art; there are athletic kids who seek sports; and maybe, there are the engineering kids who want to problem-solve. And if that’s the case, people like Leah Weaver would be their inspiration.
  • September

    Gathright Dam pulse release underway

    At 6 a.m. today, operators at Gathright Dam near Covington, Virginia began conducting a pulse release. The pulse will gradually increase and peak at 3,500 cubic feet per second by 9 a.m. The maximum surge will last two hours, begin to gradually decrease at 11 a.m., and return to 240 cfs by 1:30 p.m.