Gathright Dam semi-annual inspection
Anthony Lockidge, supervisory facility operations specialist and Dam operator for USACE Norfolk District exits the Gatheright Dam outlet tunnel during May 11 during the semi-annual dam inspection. The dam continues to perform as intended with the staff taking great care to maintain and operate safely. (U.S. Army photo/Breeana Harris)