Deep_Creek_Replacement_Plans
Replace existing two-lane drawbridge with a 144-foot long, 60-foot wide Five-lane drawbridge generally along existing alignment Improvements will be phased to accommodate traffic during construction. Initially, a two-lane bridge will be constructed immediately south of the existing bridge, the existing bridge will then be demolished, and a new three-lane bridge built in its place The project includes improvements to the approaching roadways City of Chesapeake will take over operation and maintenance of the bridge upon project completion

Download Image: Full Size (1.65 MB)
Photo by: Norfolk District  |  VIRIN: 080814-A-EN999-105.JPG