Deep_Creek_Replacement_Plans
Replace existing two-lane drawbridge with a 144-foot long, 60-foot wide Five-lane drawbridge generally along existing alignment Improvements will be phased to accommodate traffic during construction. Initially, a two-lane bridge will be constructed immediately south of the existing bridge, the existing bridge will then be demolished, and a new three-lane bridge built in its place The project includes improvements to the approaching roadways City of Chesapeake will take over operation and maintenance of the bridge upon project completion