ARLINGTON, Va. -- Portions of Roosevelt Avenue, along with other Arlington National Cemetery roads, will be repaired and repaved starting spring of 2014. The projects include replacing storm drains and piping if needed. (U.S. Army photo/Patrick Bloodgood)