Public Notice Distribution List

To be added to the Regulatory Branch Public Notice email distribution list, please send an email to Rod Desk at CENAO-.REG_ROD@usace.army.mil 

Results:
Tag: mitigation bank
Clear
  • NAO-2013-2343

    Expiration date: 1/20/2014

    The bank sponsor proposes to establish, design, construct, and operate a compensatory stream mitigation bank to be known as Frog Bottom Umbrella Mitigation Bank. The bank will be located on approximately 123 acres in Pittsylvania County, Va. The purpose of the mitigation bank is to provide off-site compensatory mitigation for projects that result in unavoidable impacts to streams in the Roanoke Drainage basin. The comment period ends on Jan. 20, 2014.

  • NAO-2013-100

    Expiration date: 1/10/2014

    The proposed mitigation bank site is located on approximately 322.6 acres of mixed forested and pastured land. The site is located along Ravenscroft Road in Henry County, Va., (Lat N36.769312, Long W -79.783202). The proposed bank site is in the headwaters of Leatherwood Creek, which drains to the Smith River, a tributary of the Dan River. The bank sponsor proposes to establish, design, construct, and operate a compensatory wetland and stream mitigation bank to be known as Ravenscroft Stream Mitigation Bank. The goal of the bank is to protect and enhance water quality, as well as provide compensatory mitigation for authorized impacts within the authorized service area. The geographic service area of this mitigation bank would include the Roanoke River sub‐basin (HUC: 03010103). This proposed service area would include Henry, Patrick, Franklin, Pittsylvania, Halifax, Bedford, Roanoke, and Montgomery Counties and their associated Cities. The bank will consist of preservation of 4,941 linear feet (LF) of perennial streams, enhancement of 662 LF of perennial streams, and restoration of 8,347 LF of perennial streams. 681 SMU’s (4.4% of total credits) are generated from preservation and 14,878 SMU’s (95.6% of total credits) are generated from restoration and enhancement.

  • NAO-2008-01186

    Expiration date: 5/10/2013

    The bank sponsor proposes to establish, design, construct, and operate a compensatory wetland mitigation bank to be known as Tidewater Mitigation Bank to provide off-site compensatory mitigation for projects that result in unavoidable impacts to wetlands and other waters of the United States in the Chesapeake Bay drainage basin.

  • Pn 2012-2032

    Expiration date: 1/17/2013

    The bank sponsor proposes to establish a compensatory mitigation banking agreement to provide mitigation for impacts to streams in the specified service area within Loudoun, Fauquier, Prince William, Fairfax, and Stafford Counties.
  • NAO-2003-01474

    Expiration date: 1/14/2013

    The District Engineer has received a mitigation site addendum to establish stream credits on the Bender Farm (Potomac River Umbrella Mitigation Bank) compensatory mitigation site for Federal and State permits.