  • NAO-2012-2152

    Expiration date: 6/21/2013

    The applicant, PCN, LLC proposes to construct sheet pile wall with associated rip rap along the southern boundary of the property known as Curles Neck Farm in order to manage the wetland and open water area of the farm for waterfowl habitat. Public comment period ends June 21, 2013.

  • NAO-2012-2048

    Expiration date: 4/29/2013

    The bank sponsor proposes to establish, design, construct and operate a compensatory stream mitigation bank to be known as the Lower James Stream Mitigation Bank. The purpose of the mitigation bank is to provide off-site compensatory mitigation for projects that result in unavoidable impacts to non-tidal streams in the James River Watershed. Public comment period ends April 29, 2013.

  • NAO 2009-2433

    Expiration date: 2/11/2013

    This is a reissuance of the original public notice dated September 7, 2012 to show recently submitted changes to the project. These changes include additional impacts to open water pond areas on the property. The applicant proposes to construct a mixed use development to include multi-family and single family housing developments along with roads and utility servitudes. Public comment period ends Feb. 11, 2013.

  • NAO 2012-2152

    Expiration date: 2/4/2013

    The applicant proposes to construct an earthen berm along the southern property boundary of the property known as Curles Neck Farm in order to protect the wetland system from sea level rise. The applicant proposes to convert an onsite borrow pit into a mitigation area and create 3.1 acres of tidal forested wetlands and 0.5 acres of emergent tidal wetlands. Public comment period ends Feb. 4, 2013.

  • NAO 2010-0364/2011-V1116

    Expiration date: 1/31/2013

    The applicant, Elizabeth River Crossings, OpCo, LLC is proposing modifications to the Midtown Tunnel construction permit which was originally issued in November 2012 for work in the Elizabeth River in the cities of Norfolk and Portsmouth. These modifications include deeper dredge cuts to remove unsuitable materials, revisions to the location and design of three temporary piers, and the use of timber pilings to support turbidity curtains. Public comment period ends Jan. 31, 2013.