Results:
Tag: Virginia
Clear
  • NAO-2016-1919/16-V1496

    Expiration date: 12/30/2016

    The applicants propose to mechanically dredge approximately 428 cubic yards (5,371 square feet) at a maximum depth not to exceed -3 feet below mean low water (MLW) in order to provide three residents access to the Baycliff community channel. The project is located in Mill Dam Creek, a tributary to Broad Bay, at Harbor Lane In Virginia Beach, Virginia. Public comment period ends Dec. 30, 2016.

  • NAO-2005-01458

    Expiration date: 10/13/2016

    Vulcan is proposing to expand mining operation at the existing quarry. The project will impact 1.22 acres of forested wetlands, 0.88 acre of emergent wetlands, 0.63 acre of open water, and 440 linear feet of stream channel. Total cumulative impacts for the project are 1.81 acres of forested wetlands, 0.88 acre of emergent wetlands, 0.63 acre of open water and 645 linear feet of stream channel. The applicant indicated that impact have been avoided and minimized by avoiding impacts to the James River and its RPA and Goode Creek. To mitigate for the proposed impacts, the applicant proposed to purchase 3.32 wetland credits from the James River Mitigation Bank and 359 stream credits from the Amelia Environmental Bank.

  • NAO-2013-01564/16-V1391

    Expiration date: 11/13/2016

    JLB Dulles Tech LLC proposes to construct a residential development that will include two multi-family residential buildings with associated infrastructure and the McNair Farms Drive extension to connect Dulles Technology Center drive with Centreville Road in Fairfax County, Virginia.

  • NAO-2005-01458

    Expiration date: 10/13/2016

    Vulcan is proposing to expand mining operation at the existing quarry. . The project will impact 1.22 acres of forested wetlands, 0.88 acre of emergent wetlands, 0.63 acre of open water, and 440 linear feet of stream channel.Total cumulative impacts for the project are 1.81 acres of forested wetlands, 0.88 acre of emergent wetlands, 0.63 acre of open water and 645 linear feet of stream channel. The applicant indicated that impact have been avoided and minimized by avoiding impacts to the James River and its RPA and Goode Creek. To mitigate for the proposed impacts, the applicant proposed to purchase 3.32 wetland credits from the James River Mitigation Bank and 359 stream credits from the Amelia Environmental Bank.

  • NAO-2005-2549

    Expiration date: 10/29/2016

    Moore's Point, LLC, proposes to build 161 residential lots on 48.855 acres of land located between Nansemond Parkway and Portsmouth Blvd in Suffolk, Virginia. All of the lots and most of the roads will be constructed on uplands. The project requires that two access roads be constructed through forested wetlands.