Public Notice Distribution List

To be added to the Regulatory Branch Public Notice email distribution list, please send an email to Rod Desk at CENAO-.REG_ROD@usace.army.mil 

Results:
Tag: public notice
Clear
  • Mitigation bank, in-lieu fee meeting schedued for June 8

    Expiration date: 5/25/2022

    The U.S. Army Corps of Engineers, Norfolk District Regulatory Branch and the Virginia Department of Environmental Quality are hosting a Mitigation Bank/In Lieu Fee meeting.
  • NAO-2016-01624 QTS, Henrico County, Virginia

    Expiration date: 5/20/2022

    Quality Investments Richmond, LLC proposes to complete the construction on a 210-acre site and discharge fill material in 2.14 acres of forested wetlands for the purpose of industry to expand an existing data center located at 6000 Technology Boulevard in the White Oak Technology Park in Henrico County, Virginia.
  • Notice of Availability: Draft Finding of No Significant Impact and Draft Environmental Assessment

    Expiration date: 5/16/2022

    The United States Army is publishing this notice to announce the availability of the Draft Finding of No Significant Impact and Draft Environmental Assessment (EA) to make upgrades to the existing river water reservoir and outfall 40 cooling water channel at Holston Army Ammunition Plant (HSAAP) in Kingsport, Tennessee. The proposed action is needed to ensure safe and environmentally compliant manufacturing operations at HSAAP. This notice complies with Section 2(a)(4) of EO 11988 and Section 2(b) of EO 11990. The Army requests public comment to determine if there are any public concerns regarding the project’s potential impacts on wetlands and floodplains. The public comment period ends May 16, 2022.

  • NAO-2019-02026 (Dulles Toll Rd to GW Parkway improvement project)

    Expiration date: 5/2/2022

    The Lane Construction Corporation submitted a proposal for a construction project to improve a section of the I-495 corridor from Dulles Toll Road to the vicinity of the George Washington Memorial Parkway, comment period closes May 2.
  • NAO-2021-03224 / JPA # 21-V2393

    Expiration date: 4/29/2022

    The City of Newport News proposes to stabilize approximately 950 linear feet of eroding shoreline by installing (2) 170-foot offshore breakwaters, a 150-foot spur, discharging sand fill, planting vegetation, and performing minor bank grading. The project is located at Riverview Farm Park in Newport News along the shoreline of the Warwick River (37.08252°N; -76.53274°W).