Public Notice Distribution List

To be added to the Regulatory Branch Public Notice email distribution list, please send an email to Rod Desk at CENAO-.REG_ROD@usace.army.mil 

Results:
Tag: bulkhead
Clear
  • NAO-2012-2152

    Expiration date: 6/21/2013

    The applicant, PCN, LLC proposes to construct sheet pile wall with associated rip rap along the southern boundary of the property known as Curles Neck Farm in order to manage the wetland and open water area of the farm for waterfowl habitat. Public comment period ends June 21, 2013.

  • NAO-1996-02465_12-V0366

    Expiration date: 8/24/2012

    Department of Game and Inland Fisheries proposes to realign and improve the navigable entrance of the canal at the entrance to Back Bay from the Princess Anne Wildlife Management Area boat launch facility in Virginia Beach, Va. by reconstructing the recently demolished jetties and dredging fopm outside the jetty to a point inside the entrance of the canal. Bulkhead and riprap propsed to prevent erosion along canal.