Public Notice Distribution List

To be added to the Regulatory Branch Public Notice email distribution list, please send an email to Rod Desk at CENAO-.REG_ROD@usace.army.mil 

Results:
Tag: U.S. Army Corps of Engineers
Clear
  • NOTICE OF RELEASE OF THE NORFOLK HARBOR NAVIGATION IMPROVEMENTS, ANCHORAGE F MODIFICATIONS, DRAFT LIMITED REEVALUATION REPORT/SUPPLEMENTAL ENVIRONMENTAL ASSESSMENT

    Expiration date: 6/23/2025

    The U.S. Army Corps of Engineers and the Virginia Port Authority announce the release of the Draft Limited Reevaluation Report/Supplemental Environmental Assessment (LRR/SEA) for the Norfolk Harbor Navigation Improvements, Anchorage F Modifications Study.
  • NAO-1995-08595 (VARTF SH-8_Mt. Sydney, Augusta County, Virginia)

    Expiration date: 4/5/2025

    The Sponsor proposes to design, construct, establish and operate a stream and non-tidal wetland compensatory mitigation site known as SH-8 Mt. Sydney in the Shenandoah River watershed. The Sponsor proposes to generate approximately 11, 943 Unified Stream Methodology (USM) credits and approximately 35.64 non-tidal wetland credits through the completion of on-site restoration, enhancement, and preservation activities. Comments should be received by the close of business on April 5, 2025.
  • NAO-2022-02853 (Fleetwood East Mitigation Bank, Fauquier County, Virginia)

    Expiration date: 6/27/2024

    The Sponsor proposes to design, construct, establish, and operate Fleetwood East Mitigation Bank (Bank). The sponsor is proposing 27.34 wetland credits to be generated through wetland creation (20.65 acres) and wetland enhancement (16.17 acres) and 22,768 stream credits to be generated through a combination of stream restoration, stream enhancement, stream buffer establishment (87 acres), and livestock exclusion along a combination of 23,044 linear feet of existing streams. The purpose of the Bank is to provide off-site compensatory mitigation for projects that result in unavoidable impacts to waters of the U.S. including wetlands and streams. Comments should be received by the close of business on June 27, 2024.
  • NAO-2021-02660 (Cedar Creek Mitigation Bank, Powhatan, Virginia)

    Expiration date: 10/8/2023

    The Sponsor proposes to design, construct, establish, and operate a wetland compensatory mitigation site known as the Cedar Creek Wetland Bank (Bank). The purpose of the Bank is to provide off-site compensatory mitigation for projects that result in unavoidable impacts to wetlands Public comments should be received by the close of business on October 8, 2023.

  • Notice of Availability: Draft Finding of No Significant Impact / Environmental Assessment New River Water Intake Structure and Pump House at Holston Army Ammunition Plant, Tennessee

    Expiration date: 4/14/2023

    The United States Army is publishing this notice to announce the availability of the Draft Finding of No Significant Impact (FNSI) and Draft Environmental Assessment (EA) to construct a new river water intake structure and pump house in Area B at Holston Army Ammunition Plant (HSAAP). The purpose of the proposed action is to construct a new intake structure and associated pump house to meet Rule 316(b) requirements while providing adequate capacity for water intake at full RDX/HMX production capacity. The Draft FNSI, Draft EA, and Draft FNPA are available for review for 30 days with all comments due on or before April 14, 2023.