Public Notice Distribution List

To be added to the Regulatory Branch Public Notice email distribution list, please send an email to Rod Desk at CENAO-.REG_ROD@usace.army.mil 

Results:
Tag: Tinker Creek
Clear
  • NAO-2025-01857 (Project Raspberry, Botetourt, Virginia)

    Expiration date: 4/9/2026

    The applicant requests authorization to construct a mission-critical data center campus known as Project Raspberry, consisting of three data center buildings (approximately 300,000 square feet each), three substations, an office building, and associated infrastructure in Daleville, Botetourt County, Virginia. The proposed project would result in permanent impacts to approximately 3.24 acres of non-tidal wetlands and 6,834 linear feet of stream channel associated with site grading and infrastructure construction.

  • NAO-1998-02442 (Botetourt Center at Greenfield)

    Expiration date: 4/9/2022

    Botetourt County proposes to widening an existing road within the Botetourt Center at Greenfield resulting in temporary and permanent impacts to an unnamed tributary of Tinker Creek. The perennial stream is located on the eastern side of Lots A, B, and C, and west of International Parkway. The impact area is located at approximately 37.438669 (latitude), -79.919651(longitude) and consists of 244 square feet of permanent stream impact across 105 linear feet of stream. Public comments should be received by April 9, 2022.

  • NAO-2013-0373/13-V1448

    Expiration date: 3/12/2014

    Appalachian Power Company (AEP)proposes to upgrade the existing Cloverdale Extra High Voltage (EHV) Transmission System. As a result of the completion of the Regional Transmission Expansion Plan (RTEP), PJM Interconnection, the regional transmission organization has determined that the upgrades are necessary for AEP to meet mandatory reliability criteria. In order to address the voltage and thermal problems, congestion and equipment obsolescence, AEP will be installing new transformers, constructing new transmission lines, constructing a new 500 kV substation (East Yard), expanding the existing West 765 kV and North 345 kV Yards, constructing four new EHV transmission lines between the existing and new yards and relocating 4 existing high voltage transmission lines.