  • NAO-2012-02097

    Expiration date: 3/29/2020

    Luck Stone Corporation plans to expand the Luck Stone - Prince Edward plant to meet the current and future needs of demands for crushed aggregates in the local area.

  • NAO-2017-0942

    Expiration date: 8/14/2019

    Chesterfield Economic Development Authority proposes to provide a development site for buildings, parking areas, connecting roadways, utilities and stormwater management facilities known as the American Tobacco site on 324 acres. The applicants stated purpose is to construct a large scale data center.

  • 2001-03702, 18-V0220

    Expiration date: 4/2/2018

    Base Camp Holding is proposing to complete construction of a single family residential development known as Summerlake. The project was previously authorized by the Corps but the applicant did not complete construction of the development prior to the expiration date of the permit. The project site is approximately 97 acres and is located south of Otterdale Branch, generally west of Otterdale Road, in Chesterfield County, Virginia. The site drains into Otterdale Branch, which drains into Swift Creek, a tributary to the Appomattox River. The applicant is seeking authorization to impact 0.372 acre of forested wetlands and 375 linear feet of stream channel associated with the construction of 212 lots, roads, utilities, and erosion and sediment control measures. . The applicant previously provided compensatory mitigation for the impacts by making a monetary contribution to the Virginia Wetland Restoration Trust Fund in the amount of $ 119,070.00 and by purchasing 1.6 wetland mitigation credits. Total cumulative permanent impacts for the construction of Summerlake are 2.26 acres of forested wetlands and 1,143 linear feet of stream channel.

  • NAO-1990-2297

    Expiration date: 3/27/2018

    The project is located on North Buckskin Creek a tributary of the Appomattox River and James River and the Chesapeake Bay at the intersection of U.S. 360 and Maplewood road in Amelia County, Virginia. *Comments will be accepted up to two weeks after the cutoff date do to mailing delays.

  • 2006-06600, 17-V2071

    Expiration date: 3/16/2018

    RP2B, LLC proposes to construct a townhome development to be known as “Millpointe Townhomes” consisting of 99 units, utilities, road widening, amenities and erosion and sediment control measures. As proposed, the project will result in the permanent impact to 731 linear feet of stream channel, 0.88 acre of forested wetlands, and the permanent impact to 0.02 acre of forested wetlands. To mitigate for these impacts, the applicant proposes to purchase a total of 1.74 wetland credits and 748 stream credits from Weatherbury Mitigation Bank and the Amelia Environmental Bank. The project is approximately 52 acres and is located on the north line of Centerpointe Parkway, south of Route 288, east of Brandermill Parkway, in Chesterfield County, Virginia. The project site drains into Tomahawk Creek, a tributary to the Swift Creek, which drains into the Appomattox River.