NAO-2025-00792 (Between the Bridges Mitigation Bank, New Kent County, Virginia)

U.S. Army Corps of Engineers Norfolk District
Published Sept. 15, 2025
Expiration date: 10/15/2025

NAO-2025-00792

TO WHOM IT MAY CONCERN: The Norfolk District, U.S. Army Corps of Engineers (Corps) received a complete prospectus on August 13, 2025, from Clearwater Mitigation III, LLC, proposing the establishment of the Between the Bridges Mitigation Bank Mitigation Bank to offset non-tidal wetland impacts authorized as part of future federal and state permits. The purpose of this notice is to solicit comments and recommendations from the public, federal, state, and local agencies and officials, Indian tribes, and other interested parties concerning the work as described below.

SPONSOR:   
Clearwater Mitigation III, LLC
2805 Park Ave
Richmond, VA 23221

AGENT:        
Clearwater Ventures, LLC
2805 Park Ave
Richmond, VA 23221

WATERWAY AND LOCATION: The proposed compensatory mitigation site (the Bank) is located south of Pocohontas Trail (Route 60) and Interstate 64, west of Courthouse Road (Route 155), and east of Adkins Road (Route 618), in New Kent County, Virginia at 37.436511 -77.044640. The Bank site was previously used for sand and gravel mining and operations and is comprised primarily of abandoned gravel pits, berms and uplands. The Bank is adjacent to Jones Run and is located within the Chickahominy River Basin. The Bank limits are approximately 62 acres.

PROPOSED WORK and PURPOSE:  The Sponsor is proposing 50.14 acres of wetland restoration, 4.98 acres of wetland preservation, and 6.19 acres of upland buffer preservation. The Sponsor proposes to generate a total of 57.31 wetland credits upon completion of the activities approved under the mitigation work plan.

The purpose of the mitigation project is to provide off-site compensatory mitigation for projects that result in unavoidable impacts to wetlands in the Lower & Middle James River Watershed.

The Bank’s proposed Primary Service Area is comprised of the Middle James River Watershed within HUCs 02080205, 02080206, 02080207 and 020820208.  The Bank’s proposed Secondary Service Area, within the James River Watershed, is comprised of 02080203 and 02080204.

Oversight of the Project would be by an existing group of federal and state agency representatives. This interagency oversight group is known as the Interagency Review Team (IRT).  The Corps, the Virginia Department of Environmental Quality (DEQ), chair the IRT. 

The Corps, the DEQ, and the VMRC provide no guarantee that any individual or general permit will be granted authorization to use the Project to compensate for unavoidable wetland impacts associated with a permit verified, authorized, or issued by the Corps, pursuant to Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403), and/or by the DEQ pursuant to Section 401 of the Clean Water Act and Title 62.1 of the Code of Virginia and/or the VMRC pursuant to Title 28.2 of the Code of Virginia.

A copy of the Between Two Bridges Mitigation Bank Prospectus can be found on the Corps Regulatory In-lieu Fee and Bank Information Tracking System (RIBITS) website Public Notices (army.mil)

https://ribits.ops.usace.army.mil/ords/f?p=107:622:1800163446844::NO

AUTHORITY: Issuance of public notices regarding proposed compensatory mitigation sites is required pursuant to Compensatory Mitigation for Losses of Aquatic Resources; Final Rule as published April 10, 2008, in the Federal Register, Vol. 73, No. 70, pages 19,594-19,705 (33 CFR 325 and 332 and 40 CFR 230). This is not an application for work in federally regulated waters; however, authorization under Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act (CWA) may be required for implementation of the proposed work, if approved. No decision has been made as to whether this proposed mitigation bank will be approved.

FEDERAL EVALUATION OF APPLICATION: The Corps is soliciting comments from the public; federal, state, and local agencies and officials; Indian Tribes; and other interested parties to consider and evaluate this proposed Project. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, conservation, economics, aesthetics, general environmental concerns, wetlands, fish and wildlife values, flood hazards, flood plain values, land use classification, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, and consideration of property ownership. If the Sponsor is advised and/or chooses to submit a draft mitigation banking instrument, the Corps will use the comments received on this public notice to inform an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act.

CULTURAL RESOURCES: The Corps evaluated the undertaking pursuant to Section 106 of the National Historic Preservation Act (NHPA) utilizing its existing program-specific regulations and procedures along with 36 CFR Part 800. The Corps’ program-specific procedures include 33 CFR 325, Appendix C, and revised interim guidance issued in 2005 and 2007. The District Engineer reviewed a recent Phase I Cultural Resource Survey, consulted district files and records and the latest published version of the National Register of Historic Places and initially determines that:

Historic properties (i.e., properties listed in or eligible for inclusion in the National Register of Historic Places), are present within the Corps’ permit area; however, the undertaking will have no effect on these historic properties. The Corps has received concurrence from the State Historic Preservation Office and no comments were received from the Tribal Historic Preservation Office following initial coordination.

The District Engineer’s final eligibility and effect determination will be based upon coordination with the SHPO and/or Tribal Historic Preservation Office, as appropriate and required, and with full consideration given to the proposed undertaking’s potential direct and indirect effects on historic properties within the Corps-identified permit area.

ENDANGERED SPECIES:  Our preliminary determination for the Mitigation Bank is that the proposed activity may affect but is not likely to adversely affect any federally endangered or threatened species or their critical habitat. However, pursuant to Section 7 of the Endangered Species Act (16 U.S.C. 1531), the District Engineer is consulting with the appropriate Federal agency to determine the presence of, and potential impacts to, listed species in the project area or their critical habitat.

ESSENTIAL FISH HABITAT: There is no EFH in the Corps area of responsibility.

NAVIGATION: The proposed structure or activity is not located in the vicinity of a federal navigation channel.

VIRGINIA’S COASTAL ZONE MANAGEMENT PROGRAM: For compliance with the Coastal Zone Management Act of 1972, as amended for projects located in Virginia’s Coastal Zone, the applicant must certify that federally licensed or permitted activities affecting Virginia's coastal uses or resources will be conducted in a manner consistent with the Virginia’s Coastal Zone Management Program (Virginia CZM Program), and obtain concurrence from the Department of Environmental Quality (DEQ), Office of Environmental Impact Review (OEIR). It is the applicant’s responsibility to submit a consistency certification to the OEIR at eir@deq.virginia.gov for concurrence or objection, and proof of concurrence must be submitted to the Corps prior to final permit issuance. A template federal consistency certification can be found in the Federal Consistency Manual here: https://www.deq.virginia.gov/our-programs/environmental-impact-review/federal-consistency.

For more information or to obtain a list of the enforceable policies of the Virginia CZM Program, contact the DEQ-OEIR at (804) 659-1915 or e-mail: bettina.rayfield@deq.virginia.gov.

The applicant has not submitted concurrence.

WATER QUALITY CERTIFICATION: Water Quality Certification may be required from the Virginia Department of Environmental Quality. The Clean Water Act (CWA) Section 401 Certification Rule (Certification Rule, 40 CFR 121), effective September 11, 2020, requires certification, or waiver, for any license or permit that authorizes an activity that may result in a discharge. The scope of a CWA Section 401 certification is limited to ensuring that a discharge from a Federally licensed or permitted activity will comply with water quality requirements. To comply with the Virginia Section 401 Water Quality Certification Program and the Certification Rule, the applicant is responsible for adhering to the procedures outlined in the Certification Rule when requesting certification from the certifying authority, the Virginia Department of Environmental Quality. In accordance with Certification Rule part 121.12, the Corps will notify the U.S. Environmental Protection Agency Administrator when it has received a Department of the Army (DA) permit application and the related certification. The Administrator is responsible for determining whether the discharge may affect water quality in a neighboring jurisdiction. The DA permit may not be issued pending the conclusion of the Administrator’s determination of effects on neighboring jurisdictions.

NOTE:  This public notice is being issued based on information furnished by the Sponsor and their Agent. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program.

PRIVACY AND CONFIDENTIALITY:  Comments and information, including the identity of the submitter, submitted in response to this Public Notice may be disclosed, reproduced, and distributed at the discretion of the Corps. Information that is submitted in connection with this Public Notice cannot be maintained as confidential by the Corps. Submissions should not include any information that the submitter seeks to preserve as confidential.

COMMENT PERIOD: The Norfolk District will receive written comments on the application, as outlined above, until the close of business on October 14, 2025.

Comments can be submitted electronically via the Regulatory Request System (RRS) at https://rrs.usace.army.mil/rrs. The Point of Contact for this Mitigation Bank is Keith Goodwin: email at:  CENAO_REG_MitigationTeam@usace.army.mil

Alternatively, you may submit comments in writing to the Commander, U.S. Army Corps of Engineers, Norfolk District, Attention: Keith Goodwin (CENAO-WRR), 803 Front Street, Norfolk, VA  23510-1011, Please refer to the application number in your comments.

Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider the application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. Requests for a public hearing will be granted, unless the District Engineer determines that the issues raised are insubstantial or there is otherwise no valid interest to be served by a hearing.

If you have any questions about this application, contact:

Keith Goodwin at (757)-613-5431 or via email at keith.r.goodwin@usace.army.mil and copy CENAO_REG_MitigationTeam@usace.army.mil