The Corps constructed three acres of three-dimensional (3-D) mounded reefs and 100 acres of two-dimensional (2-D) flats in DATE. The project was designed by the Virginia Marine Resources Commission (VMRC).
The reefs and flats were all constructed out of “fossil” oyster shells.
The 3-D reefs were set aside as sanctuaries. Sanctuaries are areas where fishing for oysters is not allowed.
The 2-D flats are open for commercial fishing of oysters.
This Corps project was designed under the direction of VMRC primarily to increase the commercial harvest of oysters.
This type of project is called a “repletion” project by state fishery managers in Virginia and Maryland, and is basically a continuation of outdated commercial oyster fishery management methods.
Repletion projects are different from restoration projects. A restoration project is built primarily for environmental benefits, such as water filtration. A repletion project is built primarily in an attempt to increase the commercial harvest of oysters.