Results:
Archive: September, 2019
Clear
  • 2019-RP-11

    Expiration date: 9/26/2024

    Norfolk District announces the issuance of Regional Permit 11 in support of the administration's initiative to streamline the approval and construction of infrastructure projects in Virginia. RP-11 is for use by the Virginia Department of Transportation to expedite projects that would qualify for a nonreporting nationwide permit but for the Endangered Species Act general condition. RP-11 will allow VDOT to go to construction more quickly in cases where it can comply with the Endangered Species Act through informal consultation. In those cases, a preconstruction notification is not required, but VDOT will report the projects proceeding under RP-11.
  • NAO-2019-01281

    Expiration date: 10/28/2019

    Prologis Downs Park JV LLC is proposing to construct a distribution facility with accessory office space on a 5-acre parcel at 45111 Loudoun Downs Lane in Loudoun County, Virginia. About 1.15 acres of wetlands will be impacted by the proposed work.

  • NAO-1994-1166

    Expiration date: 10/24/2019

    Hampton Roads Connector Partners proposes to expand Interstate 64 in Virginia, including the Hampton Roads Bridge-Tunnel, from Settlers Landing Road in Hampton to the I-564 interchange in Norfolk. The total project length is about 9.9 miles, 1.8 miles of which is proposed tunnel and island expansion. The project will permanently impact 18.92 acres of subaqueous bottom, 0.4 acres of submerged aquatic vegetation, 3.75 acres of tidal wetlands and 0.86 acres of nontidal wetlands.

  • NAO-2017-01269

    Expiration date: 10/12/2019

    The city of Virginia Beach proposes to modify their individual permit for the dredging and placement of beach nourishment along Chesapeake and Ocean Park beachs. The modification will place an additional 350,000 cubic yards of sand material along the shoreline, resulting in additional impacts to approximately 6.5 acres of intertidal non-vegetated wetlands and 26.5 acres of subaqueous bottom.

  • ​NAO 2019-01420

    Expiration date: 10/11/2019

    The sponsor proposes to establish, design, construct, and operate a compensatory wetland and stream mitigation site to be known as the Possum Creek Mitigation Bank. The purpose of the mitigation project is to provide off-site compensatory mitigation for projects that result in unavoidable impacts to wetlands and streams and other waters of the United States.