Results:
Archive: 2015
Clear
  • NAO-2015-2184/15-V1792

    Expiration date: 2/1/2016

    The City of Virginia Beach proposes to hydraulically dredge navigable channels in Lake Rudee in order to restore residents' safe access channels. Additionally, the city proposes to remove accumulated sediment in the channels and in the access basins around private owner’s docks, piers, and similar facilities. Public comment period ends Feb. 1, 2016.

  • NAO-2015-00242

    Expiration date: 1/22/2016

    Highlands Conservation Group, LLC proposes to establish and operate a wetland and stream compensatory mitigation bank to provide off-site compensatory mitigation for projects that result in unavoidable impacts to wetlands and streams within the specified geographic service area. The proposed mitigation bank site, to be known as New River Highlands Mitigation Bank, is comprised of approximately 52 acres of land located on Moore's Creek, a tributary of the New River, in Grayson County, Virginia. The public comment period ends Jan. 22, 2016.

  • NAO-2012-1439 - Crosstrail Boulevard (Segment B)

    Expiration date: 1/21/2016

    Loudoun County Department of Transporation and Capital Infrastructure plan to construct a connector roadway, Crosstrail Boulevard (Segment B) in Loudoun County, Virginia. The project consists of the discharge of fill materials into waters of the United States. Public comment period ends Jan. 21, 2016.

  • NAO-2008-03470 Route 460

    Expiration date: 1/20/2016

    The applicant proposes to construct improvements along the U.S. Route 460 Corridor from approximately one mile west of Zuni to the Route 460/Route 58 interchange in Suffolk, Virginia. A Public Notice announcing receipt of the application and requesting comments was published Nov. 30, 2015, with a comment period ending Jan. 5, 2016. The comment period is extended until Jan. 20, 2016.
  • NAO-2007-02856; I64 - I24 Interchange

    Expiration date: 1/21/2016

    The applicant proposes to widen the existing Ramp D-7 of the I64-I264 Interchange, including work extending through the Newtown Rd. interchange on I264. The proposed project includes new bridges over Kempsville Rd. and Newtown Road; widening the I64 bridge over Curlew Dr.; widening the eastbound I264 collector/distributor (C/D) road to four lanes between I64 and off-ramp to southbound Newtown Rd.; widening eastbound I264 to three lanes between loop ramps; and widening eastbound I264 C/D by one lane between Newtown and Witchduck Rd.'s.