Results:
Archive: 2013
Clear
  • NAO-2008-00429 13-V1389

    Expiration date: 10/10/2013

    The applicant is proposing to permanently impact 0.69 acre of palustrine emergent wetlands and to temporarily impact 0.31 acre of palustrine emergent wetlands for the construction of a two-lane road in Chesterfield County, Va. The proposed road will ultimately connect the existing Meadowville Parkway to Enon Church Road. Public comment period ends Oct. 10, 2013.

  • NAO-2009-00949-CENAO-WR-RS

    Expiration date: 9/22/2013

    The Norfolk District Corps of Engineers has established a temporary Danger Zone for the period of September 6-22, around the NASA Wallops Flight Center in Accomack, Va., for the NASA Lunar Atmosphere and Dust Environment Explorer (LADEE) and Antares. Expiration date: 9/22/2013
  • NAO-2013-01661

    Expiration date: 9/29/2013

    The site sponsor proposes to design, construct, and steward a compensatory wetland and stream mitigation site which is known as LJ-15 Chippokes Creek (Bacon’s Castle). The purpose of the mitigation project is to provide off-site compensatory mitigation for projects that result in unavoidable impacts to stream and other waters of the United States in the Lower James Drainage basin. The goal of the mitigation site is to provide appropriate mitigation for impacts, within the authorized service area, by performing stream, wetland and riparian buffer preservation and restoration.

  • Buckroe Beach public meeting, comment period

    Expiration date: 9/26/2013

    The U.S. Army Corps of Engineers is proposing no further remedial action at the Buckroe Beach Formerly Used Defense Site in Hampton, Va. On tap: 30-day public comment period; Sept. 12 public meeting to comment on and learn more about the project’s proposed plan. Public comment period ends Sept. 26, 2013.

  • NAO-2013-01660

    Expiration date: 9/30/2013

    The site sponsor proposes to design, construct, and steward a 134 acre compensatory stream mitigation site which is known as SH-6 Shenandoah River (Cedar Creek Battlefield) VARTF. The purpose of the mitigation project is to provide off-site compensatory mitigation for projects that result in unavoidable impacts to stream and other waters of the United States in the Shenandoah River Drainage basin. Public comment period ends Sept. 30, 2013.