US Army Corps of Engineers
Norfolk District Website

Results:
Archive: 2012
Clear
  • NAO-2003-01474

    Expiration date: 1/14/2013

    The District Engineer has received a mitigation site addendum to establish stream credits on the Bender Farm (Potomac River Umbrella Mitigation Bank) compensatory mitigation site for Federal and State permits.

  • NAO-2011-01672

    Expiration date: 1/11/2013

    The applicant proposes to conduct bituminous coal extraction on a proposed surface mine of approximately 570 acres to be known as the Three Forks Surface Mine. The applicant proposes to fill and excavate waters of the U. S. during mining for the purpose of recovering approximately 750,000 tons of coal from the Big Fork, Kennedy, Aily, Raven, and Tiller coal seams including all necessary support facilities (sediment control, access/haul roads, etc.) providing high quality thermal and primarily bituminous coal to meet current and future contractual.

  • NAO-2011-00900

    Expiration date: 1/11/2013

    Clintwood Elkhorn Mining Company proposes to conduct bituminous coal extraction on a proposed surface mine of approximately 260 acres in Buchanan County, Va. The applicant proposes to fill and excavate waters of the U. S. during mining and excess material disposal for the purpose of recovering approximately 2.2 million tons of coal. Public comment period ends Jan. 11, 2013.

  • NAO-2010-0423/2012-1671

    Expiration date: 1/10/2013

    Danville Public Works proposes to construct Phase I of an industrial park to be known as the “Berry Hill Mega Park” in Pittsylvania County, Va. The applicant proposes to compensate for permanent stream channel impacts with permittee responsible compensation. Public comment period ends Jan. 10, 2013.

  • NAO-121207-Millennium

    Expiration date: 1/21/2013

    An Environmental Assessment (EA) has been prepared to assess the potential impacts of the expansion of Arlington National Cemetery (ANC), known as the Millennium Project. The Millennium Site will be developed to increase burial space at ANC. Building and site element construction shall be suitable for the environment and complementary to the architectural theme and historical considerations of ANC.