Results:
Tag: wetlands
Clear
  • NAO-2013-02125

    Expiration date: 12/26/2014

    The Chesterfield County Department of Transportation proposes to improve approximately 3,500 linear feet of Newby’s Bridge Road between Hagood Lane and Belmont Road in Chesterfield County, Virginia. Public comment period ends Dec. 26, 2014.

  • 2011-00961-arl

    Expiration date: 12/10/2014

    The City of Manassas proposes the construction of an in-line regional stormwater management facility that will assist the City in meeting Total Maximum Daily Load (TMDL) requirements. The approximately 24 acre project site is located to the southeast of the intersection of Rolling Road and Hospital Way in the City of Manassas, Virginia.

  • 2014-01400; 14-V1467

    Expiration date: 11/25/2014

    The applicant proposes to construct a phase of the Virginia Capital Trail Project known as Park Phase. The Park Phase is a 55 mile dedicated, paved pedestrian and bicycle trail owned by the Virginia Department of Transportation and will connect Jamestown to Richmond along the Route 5 corridor.

  • NAO-2008-03470

    Expiration date: 11/17/2014

    The Norfolk District announces the publication of a Notice of Availability of a Supplemental Environmental Impact Statement (SEIS) for the Route 460 Location Study from Prince George County to the City of Suffolk, Virginia.
  • NAO-2007-1076

    Expiration date: 10/30/2014

    September 17, 2014: The City of Norfolk submitted a permit application for improvements to the existing Western Branch Reservoir Dam. The purpose of the project is to provide reliable water supply storage for Norfolk and other communities; prevent a hazard to downstream residents, structures, roadways, or environment from potential failure of a High Hazard dam; comply with the Virginia Department of Conservation and Recreation’s (DCR) dam safety regulations; and comply with the City of Norfolk’s operating permit. Wetland and water impacts for the entire project total 2.629 acres, which include impacts to non-tidal subaqueous land, non-tidal forested wetlands, tidal subaqueous lands, tidal wetlands and intertidal areas. Public comment period ends October 17, 2014.